My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - xxxi <br />Category 2: For official use only / disclosure permissible by law. <br />SUBCONTRACTORS FORM <br />1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and electrical work (as defined by RCW Chap. 19.28), and structural steel installation and rebar installation, Bidder MUST either identify itself or Subcontractors in the chart below. If Bidder believes such work is not part of the scope of Work, Bidder shall write “NO WORK”. <br />2. Bidder shall not list more than one Subcontractor for each category of work identified, unless Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor will be used for which alternate. <br />3. Bidder’s bid shall be deemed nonresponsive and void if: <br />A. For heating, ventilation, air conditioning, plumbing, electrical, structural steel installation and rebar installation, Bidder fails (1) to submit as part of the Bid the names of such Subcontractors, (2) to name itself to perform such Work, or (3) to write “No Work”; or <br />B. Bidder names two or more Subcontractors to perform the same work. <br />4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, electrical, structural steel installation and rebar installation subcontractors applies only to proposed heating, ventilation and air conditioning, plumbing, electrical, structural steel installation and rebar installation subcontractors who will contract directly with the general contractor submitting the Bid to the City. <br />5. The heating, ventilation and air conditioning, plumbing, electrical portions of the chart below must be submitted with the bid proposal or within one hour of the published bid submittal time. <br />6. The structural steel installation and rebar installation portions of the chart below must be submitted with the bid proposal or within forty-eight hours of the published bid submittal time. <br /> <br />Type/Scope of Work Name and Address of Subcontractor/Or <br />Bidder <br />HEATING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />VENTILATION AND AIR CONDITIONING <br />Subcontractor, bidder or “no work” MUST be stated <br /> <br />PLUMBING (as described in RCW Chap. 18.106) <br />Subcontractor, bidder or “no work” MUST be stated <br /> <br />ELECTRICAL (as described in RCW Chap. 19.28) <br />Subcontractor, bidder or “no work” MUST be stated <br /> <br />STRUCTURAL STEEL INSTALLATION <br />Subcontractor, bidder or “no work” MUST be stated <br /> <br />REBAR INSTALLATION <br />Subcontractor, bidder or “no work” MUST be stated <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.