My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - xxxix <br />Category 2: For official use only / disclosure permissible by law. <br />9. Surety shall cause to be attached to this Bond current and effective Power of Attorney evidencing <br />authority of the officer, agent or representative to execute this Bond on behalf of Surety to execute and <br />deliver such Bond and bind the Surety thereby. <br />10. This Bond is intended to conform to all applicable statutory requirements. Any applicable <br />requirement of any applicable statute that has been omitted from this Bond shall be deemed to be <br />included herein as if set forth at length. If any provision of the Bond conflicts with any applicable <br />provision of any applicable statue, then the provision of said statue shall govern and the remainder of <br />this Bond that is not in conflict therewith shall continue in full force and effect. <br />11. The term "bid" as used herein includes a bid, offer or proposal as applicable. <br /> <br />BIDDER <br /> <br /> <br />_____________________________ <br />Bidder’s Name <br /> <br /> <br />By: ___________________________ <br />Signature, Title, and Date <br /> <br />Address: __________________________ <br />__________________________________ <br /> <br /> <br />Attest: ________________________________ <br />Signature, Title and Date <br />SURETY <br /> <br /> <br />_____________________________ (seal) <br />Surety’s Name and Corporate Seal <br /> <br /> <br />By: ___________________________ <br />Signature, Title, and Date <br /> <br />Address: __________________________ <br />__________________________________ <br /> <br /> <br />Attest: ________________________________ <br />Signature, Title and Date <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.