My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
The Technical Material and data contained in these Contract Provisions were prepared under the <br />supervision and direction of the undersigned, whose seal as a Professional Engineer licensed to practice <br />as such in the State of Washington, is affixed below. <br /> <br />DIVISION DESCRIPTION <br />DIVISION 1 GENERAL REQUIREMENTS <br />DIVISION 2 (excludes 2-09.3(3)D) EARTHWORK <br />DIVISION 4 BASES <br />DIVISION 5 SURFACE TREATMENTS AND PAVEMENTS <br />DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, <br />SANITARY SEWERS, WATER MAINS AND CONDUITS <br />DIVISION 8 MISCELLANEOUS CONSTRUCTION <br />8-01 Erosion Control and Water Pollution Control <br />8-02 Landscaping and Associated Items <br />8-03 Irrigation Systems <br />8-04 Curbs Gutters and Spillways <br />8-06 Cement Concrete Driveway Entrances <br />8-12 Chain Link and Wire Fence <br />8-13 Survey Monuments and Cases <br />8-14 Cement Concrete Sidewalks <br />8-21 Permanent Signing <br />8-22 Pavement Marking <br />8-101 Stormwater Treatment Facility <br />8-102 Geomembrane Liner <br />DIVISION 9 (Excludes 9-29) MATERIALS <br /> <br /> <br /> <br />Cindy Jean Kinzer, P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.