Laserfiche WebLink
0- 0 Date: 2/22/2012 <br />PUBLIC WORKS PERMIT <br />r�r t i - l; Public Works Permit #: PW1202-012. <br />City of Everett�'Public Works Deprfiient� <br />3200 Cedar Stre4,;L�_"Building Permit #; <br />Everett WA 98201 <br />Planning Reference #: <br />Public Works Fee $: $ 605.03 <br />:t. PAV iiNGDU CC I ivz{e 4-Other A S <br />OWNER NAME AND ADDRESS: I PW IN AP!?,Lll.C.t NT NAME AND ADDRESS: <br />LANCE HARVEY TRUCKING & ` RAFFIC Sw/ P. "In00 <br />ITNAVARPORT WY k�;-r-,; ,6'J0_�n <br />SNOHOMISH 98296 jI 6 005 . � s _3 f <br />PHONE: 3605684801L'';; <br />TAX PARCEL ID # SITE ADDRESS: 10130 DAKOTA WAY <br />DESCRIPTION OF PROPOSED WORK: <br />SHORT PLAT #1202-2011-007 <br />(2/22/2012 10:46 AM BES) <br />2-1" WATER SERVICES <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. PLEASE CONSTRUCT PER APPROVED PLAN. <br />5. PLEASE CONTACT INSPECTOR CLIFF LINDMAN (425)339-7404 PRIOR TO STARTING CONSTRUCTION <br />for Co <br />FINAL INSPECTION Date <br />Approved as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property maged thereby. <br />Signature of Appll <br />I WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUI <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF <br />,7,5--/ <br />Date <br />THEREAFTER IS TO BE DILIGENTLY <br />ON THIS PROJECT OVER 90 DAYS DURATION. <br />