My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11218 2ND AVE SE 2026-03-24
>
Address Records
>
2ND AVE SE
>
11218
>
11218 2ND AVE SE 2026-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2026 1:33:17 PM
Creation date
2/9/2026 2:19:25 PM
Metadata
Fields
Template:
Address Document
Street Name
2ND AVE SE
Street Number
11218
Notes
MESSAK 11218 2ND AVE SE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />OWNER NAME AND ADDRESS: <br />MESSAK NABIL N & MASSOUD <br />PONOX 544 <br />LYNNWOOD WA 98036 <br />Date: 6/8/2012 <br />Public Works Permit #: PW1206'004 <br />Building Permit #; <br />Planning Reference #: <br />Public Works Fee $: $ 368.91 <br />4,rr-i c 4. Other $: q oo <br />APPLICANT NAME AND ADDRESS: <br />OWNER <br />PHONE: 4257727981 I PHONE: <br />ITAX PARCEL ID # SITE ADDRESS: 11218 2nd AVE. <br />DESCRIPTION OF PROPOSED WORK: <br />SHORT PLAT 1202-2012-002 <br />(6/8/2012 4:18 PM BES) <br />ONE 3/4" WATER SERVICE FOR LOT-2 <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. Construct per approved plan 05/30/2012. <br />_..r,t <br />,.,,,fit <br />.Z. f <br />X .r.. <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />/B or other right-of-way use hereto applied for and further agrees <br />for Cons Ion Elate to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />FINAL INSPECTION Date ^p�' �✓ a 6 z� <br />Approved as Constructed Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.