Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2511-014 Description: Removal of existing Roof and Installing new Roof <br /> Applied: 11/6/2025 Approved: 11/10/2025 Site Address: 912 PECKS DR UNIT B <br /> Issued: 11/10/2025 Finaled: City,State Zip Code: EVERETT,WA 98203-4538 <br /> Status: PERMIT ISSUED-ONLINE Applicant: FOREVER RFNG&HM IMPRVMNT LLC <br /> Parent Permit: Owner:SANAN ASHISH&SHIVANI G <br /> Parent Project: Contractor: FOREVER RFNG&HM IMPRVMNT LLC <br /> Details: <br /> 2 UNIT DUPLEX,UNIT B RE-ROOF. <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 11/18/2025 11/18/2025 BLDG 14-ROOF Darold Phinney NOT READY see notes <br /> NAILING <br /> Notes: <br /> 11/10/2025 5:30 PM FOREVER RFNG&HM IMPRVMNT LLC <br /> Please Call prior to arriving to ensure someone will be on the job site <br /> Contact Name:FOREVER RFNG&HM IMPRVMNT LLC <br /> Site Address:912 PECKS DR UNIT B <br /> Phone:2062613683 <br /> e-Mail:info@foreverroofing.net <br /> Contractor was setting up to get started with the tear off of the existing roof when I was on site.I advised to continue and call for re inspection when <br /> roof was removed,and they will then have a better idea of what sheeting will need to be replaced. <br /> 11/19/2025 11/19/2025 BLDG 14-ROOF Darold Phinney APPROVAL see notes <br /> NAILING <br /> Notes: <br /> 11/18/2025 3:43 PM FOREVER RFNG&HM IMPRVMNT LLC <br /> Contact Name:FOREVER RFNG&HM IMPRVMNT LLC <br /> Site Address:912 PECKS DR UNIT B <br /> Phone:2062613683 <br /> e-Mail:info@foreverroofing.net <br /> Plywood replaced at places around perimeter of building. Existing composite roofing removed.Call for final inspection when ready. <br /> 11/21/2025 11/21/2025 BLDG 16-FINAL Darold Phinney APPRVD-PERMIT see notes <br /> FINAL <br /> Notes: <br /> 11/20/2025 1:13 PM FOREVER RFNG&HM IMPRVMNT LLC <br /> Contact Name:FOREVER RFNG&HM IMPRVMNT LLC <br /> Site Address:912 PECKS DR UNIT B <br /> Phone:2062613683 <br /> e-Mail:info@foreverroofing.net <br /> Contractor was finishing up last of composite roofing installation.New metal flashings,ridge venting and vent stack boots installed. Lower entry covered <br /> Printed: Monday, 24 November, 2025 1 of 2 <br /> SUPERION <br />