Laserfiche WebLink
Lenora Regional SW Facility Division C – Contract Work Order # UP3792 <br />12.Pre-Bid Inspection and Risk of Loss. It is understood that the whole of the work under this contract is <br />to be done at the Contractor’s risk and that: (1) prior to submitting its proposal or bid, it became familiar <br />with the conditions of excavation, subsurface, backfill, materials, climatic conditions, location, traffic, and <br />other contingencies that may affect the work and has made its bid or proposal accordingly and (2) that it <br />assumes the responsibility and risk of all loss or damage to materials or work that may arise from any cause <br />whatsoever prior to completion. <br />13. Headings for Convenience Only. The headings in this document are for convenience only, and shall not <br />be used or considered to interpret or construe this document. <br />14. Effective Date. This Contract is effective as of the date of the last person to sign it, and may be executed <br />in multiple counterparts, each of which shall be deemed an original. This Contract may be signed with <br />AdobeSign, and any such signature is fully binding. <br />[Remainder of Page Intentionally Left Blank] <br />4