My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vander Veen Construction 2/12/2026 Change Order 1
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Vander Veen Construction 2/12/2026 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 8:56:48 AM
Creation date
2/13/2026 8:56:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Vander Veen Construction
Approval Date
2/12/2026
Council Approval Date
2/11/2026
End Date
2/3/2026
Department
Parks & Community Services
Department Project Manager
Lolly Huggins
Subject / Project Title
Everett Parks Restroom Renovation Project
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0004732
Total Compensation
$235,036.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Project Title: Parks Restroom Renovation Date: 01/26/2026 <br />Change Order No. 1 - Exhibit A <br />No.Construction Change Directives Amount <br />1 Plumbing material to be what was already installed -credit.(4,500.00)$ EPR -CO5 <br />2 Patch holes in ceiling and repair facia @ TA Sullivan and clean roof and gutters.4,400.00$ EPR - CO9 <br />3 <br />1. Provide and install all materials and equipment outlined in specifications provided by <br />ProComm. NOTE: includes additional ADA push buttons and equipment for Legion per ASI- <br />03. <br />2. Install dedicated circuits to each bathroom mechanical room, provide and install conduit to <br />12 bathroom doors with pull strings, provide and install conduit and pull strings to motion <br />detectors and strobes at Forest Park 124,486.08$ EPR - CO8.1 <br />No.Change Order Proposals Amount <br />1 Demo of existing caps, disposal of material, labor.1,600.00$ EPR-CO1 <br />2 Toilet Carriers - Change Order (Not Accepted by Owner).-$ EPR-CO2 <br />3 New Trap Primers all restrooms.39,000.00$ EPR-CO3 <br />4 New Hammer Arrestors.5,625.00$ EPR-CO4 <br />5 Demo and dispose of metal wall in men's restroom at Forest Park location, install new material.21,025.00$ EPR-CO6 <br />6 Demo and dispose of additional existing concrete pour new TA Sullivan.4,400.00$ EPR-CO7 <br />7 <br />Install additional 2 gang 120v outlets in all three restroom chaseways and provide whip needed for low <br />voltage door subcontractor. Install surface mounted conduit pathway for door locks.2,800.00$ EPR-CO8 <br />8 <br />Demo concrete and install new curbs, patch concrete floor, install CMU to match existing install new <br />railing, paint railing.10,900.00$ EPR-CO10 <br />9 <br />1. Per ASI-03: Legion Park- Additional window flashing at sill: $500. <br />2. Provide and install additional wall “tile” (see specs for detailed product info) at Legion bathroom 101 <br />south wall and 102 north wall: $4,800. <br />3. Remove and install new FRP at 103 south wall and 104 north wall: $2,500. <br />4. Provide and install additional wall “tile” at Forest Park bathrooms 102 south wall and 103 north wall: <br />$5,500.13,300.00$ EPR-CO11 <br />10 Per ASI-04: Provide and install 2 additional baby changing stations at TA Sullivan.5,500.00$ EPR-CO12 <br />11 Install flex conduit at chase of all 3 bathrooms for low voltage wire.6,500.00$ EPR-CO13 <br />Total:235,036.08$ <br />.
The URL can be used to link to this page
Your browser does not support the video tag.