Laserfiche WebLink
Project Title: Parks Restroom Renovation Date: 01/26/2026 <br />Change Order No. 1 - Exhibit A <br />No.Construction Change Directives Amount <br />1 Plumbing material to be what was already installed -credit.(4,500.00)$ EPR -CO5 <br />2 Patch holes in ceiling and repair facia @ TA Sullivan and clean roof and gutters.4,400.00$ EPR - CO9 <br />3 <br />1. Provide and install all materials and equipment outlined in specifications provided by <br />ProComm. NOTE: includes additional ADA push buttons and equipment for Legion per ASI- <br />03. <br />2. Install dedicated circuits to each bathroom mechanical room, provide and install conduit to <br />12 bathroom doors with pull strings, provide and install conduit and pull strings to motion <br />detectors and strobes at Forest Park 124,486.08$ EPR - CO8.1 <br />No.Change Order Proposals Amount <br />1 Demo of existing caps, disposal of material, labor.1,600.00$ EPR-CO1 <br />2 Toilet Carriers - Change Order (Not Accepted by Owner).-$ EPR-CO2 <br />3 New Trap Primers all restrooms.39,000.00$ EPR-CO3 <br />4 New Hammer Arrestors.5,625.00$ EPR-CO4 <br />5 Demo and dispose of metal wall in men's restroom at Forest Park location, install new material.21,025.00$ EPR-CO6 <br />6 Demo and dispose of additional existing concrete pour new TA Sullivan.4,400.00$ EPR-CO7 <br />7 <br />Install additional 2 gang 120v outlets in all three restroom chaseways and provide whip needed for low <br />voltage door subcontractor. Install surface mounted conduit pathway for door locks.2,800.00$ EPR-CO8 <br />8 <br />Demo concrete and install new curbs, patch concrete floor, install CMU to match existing install new <br />railing, paint railing.10,900.00$ EPR-CO10 <br />9 <br />1. Per ASI-03: Legion Park- Additional window flashing at sill: $500. <br />2. Provide and install additional wall “tile” (see specs for detailed product info) at Legion bathroom 101 <br />south wall and 102 north wall: $4,800. <br />3. Remove and install new FRP at 103 south wall and 104 north wall: $2,500. <br />4. Provide and install additional wall “tile” at Forest Park bathrooms 102 south wall and 103 north wall: <br />$5,500.13,300.00$ EPR-CO11 <br />10 Per ASI-04: Provide and install 2 additional baby changing stations at TA Sullivan.5,500.00$ EPR-CO12 <br />11 Install flex conduit at chase of all 3 bathrooms for low voltage wire.6,500.00$ EPR-CO13 <br />Total:235,036.08$ <br />.