Laserfiche WebLink
Ze <br /> p E"EUVE <br /> Response to Building Review comments: <br /> Tom Fahlman JUN 12 2024 <br /> 206-914-1153 <br /> CITY OF EVERETT <br /> Permit Services <br /> 1. Understood <br /> 2. Understood <br /> 3. The building has an unfinished basement, two floors of living space, and an attic. <br /> 4. Each unit has been labeled <br /> a. The stair is existing, and is used to get to the second floor. It takes you to a <br /> hallway where you can access either of the two units on the second floor <br /> b. Thanks for the note on clearance, 3 ft minimum clearance will be met <br /> 5. Building code <br /> a. Site plan is included in drawings on P-2 and P-3 <br /> b. Understood <br /> c. Occupancy of R-2 has been added to project details, and so has construction <br /> type of VB <br /> d. Gross square feet of the building, 2888, has been added to the drawings. The <br /> entire basement is not going to be heated, and occupants will not be able to <br /> access it or use it. <br /> e. Windows and doors: <br /> i. All windows are new, but the window frames are not going to be changed <br /> except for one window that needs to be lowered to meet egress <br /> requirements. It is noted on sheet A-4. <br /> ii. Egress windows have been labeled on drawings. <br /> f. 1 hour fire resistive partitions <br /> i. %type x will be used <br /> g_ 5/type x will be used <br /> h. Understood <br /> 6. Energy Code <br /> a. Understood <br /> b. 2018 WSEC-R <br /> i. Windows have U-value of 0.3 <br /> ii. Existing exterior doors will not be changed <br /> iii. The heating of the units and water heating has been noted on page D-2 <br /> along with other energy code notes <br /> iv. See page D-2 <br />