My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Everett Station HVAC and Controls Improvements 00 21 13 - 3 <br /> <br /> <br /> <br />00 21 13 - 3 INSTRUCTIONS TO BIDDERS <br />1-02.1(2) Supplemental Bidder Responsibility Criteria <br />A. Wage Compliance. The following Supplemental Bidder Responsibility Criterion <br />applies to this Project: <br />Extended Certification of Wage Compliance. Within the five-year period <br />immediately preceding the date of the bid solicitation, the Bidder must not <br />have been determined by a final and binding citation and notice of <br />assessment issued by the department of labor and industries or through a <br />civil judgment entered by a court of limited or general jurisdiction to have <br />willfully violated, as defined in RCW 49.48.082, any provision of chapter <br />49.46, 49.48, or 49.52 RCW. <br />B. Apprentice Utilization: The following Supplemental Bidder Responsibility Criterion <br />applies to this Project if this Project has apprentice utilization requirements: <br />Certification of Apprentice Compliance. For each public project <br />completed by Bidder during the two-year period immediately preceding <br />the date of the bid solicitation, Bidder must not have been subject to a <br />final determination by the awarding agency that Bidder failed, without <br />good faith efforts approved by the awarding agency, to meet applicable <br />project apprentice utilization requirements. <br />C. Procedures for Wage Compliance and Apprentice Utilization Criteria: The Bidder <br />must sign and submit certifications as provided by the City in the bidding <br />documents (which are usually included in the Bid Form) before Project award. The <br />City may also use independent sources of information that may be available to <br />demonstrate whether the Bidder is in compliance with these criteria. A Bidder may <br />request that City modify the supplemental bidder responsibility criteria listed above. <br />This request must be in writing to the City project manager and must be received <br />by the City project manager at least ten business days before the bid opening. If <br />the City determines the Bidder does not meet the bidder responsibility criteria <br />above and is therefore not a responsible bidder, the City will notify the Bidder in <br />writing with the reasons for its determination. If the Bidder disagrees with this <br />determination, the Bidder may appeal to the director of the City department <br />responsible for this Contract (the “Director”) by presenting additional information to <br />the Director in writing within two (2) business days after receipt of the City’s <br />determination. The Director will consider the appeal and any additional information <br />and will issue a decision regarding the appeal. Any protest by Bidder of the <br />Director decision must be in strict conformity to Everett Municipal Code Chapter <br />3.46, Bid Protest Procedures. <br />D. Additional Supplemental Responsibility Criteria: If this Project is subject to <br />additional supplemental bidder responsibility criteria, then such criteria will be <br />contained in SECTION 00 22 13, SUPPLEMENTAL INSTRUCTIONS TO <br />BIDDERS and such SECTION 00 22 13 will govern those criteria. If there is no <br />SECTION 00 22 13, SUPPLEMENTAL INSTRUCTIONS TO BIDDERS in the bid <br />package, then the Project is not subject to any additional supplemental bidder <br />responsibility criteria. <br />1-02.2 Plans and Specifications <br />Information as to where bid documents can be obtained or reviewed will be found in the <br />Call for Bids (Advertisement for Bids) for the Work.