My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT BID SET <br />EVERETT STATION HVAC AND CONTROLS IMPROVEMENTS <br />PROJECT NO. 24-3201 <br /> <br />01 25 00 -3 SUBSTITUTION PROCEDURES <br />one of the products named. Advise Architect when none of the named products comply with <br />specification requirements or are not feasible for use. <br /> NON-PROPRIETARY SPECIFICATION REQUIREMENTS: Where the specifications name products or <br />manufacturers that are indicative of the type and quality of the product to be incorporated in the <br />work, followed by the term "or equal", or similar language, comply with the contract documents <br />provisions concerning "product substitutions" to obtain approval for use of an unnamed product. <br /> DESCRIPTIVE SPECIFICATION REQUIREMENTS: Where the specifications describe a product or <br />assembly defining the characteristics required, but with or without use of a brand or trade name, <br />provide products or assemblies that provide the characteristics indicated and otherwise comply <br />with contract requirements. <br /> PERFORMANCE SPECIFICATION REQUIREMENTS: Where specifications require compliance with <br />performance requirements, provide products that comply with these requirements, which are <br />recommended by the manufacturer for the application indicated. Submit manufacturer's <br />recommendations contained in published product literature, or by the manufacturer's individual <br />certification of performance for approval by Architect. General overall performance of a product is <br />implied where the product is specified for specific application. <br /> VISUAL MATCHING: Where matching an established sample is required, the owners decision will <br />be final on whether a proposed product matches satisfactorily. <br /> Where there is no product available within the specified product category which matches <br />satisfactorily and also complies with other specified requirements; comply with the <br />provisions of the contract documents concerning "substitutions" for the selection of a <br />matching product in another product category. <br /> VISUAL SELECTION: Where specified product requirements include the phrase "...as selected from <br />the manufacturer's standard colors, patterns, textures..." or similar phrases, select a product and <br />manufacturer that complies with other specified requirements. Architect will select the color, <br />patterns and texture from the product line selected. <br />1.07 SUBSTITUTIONS <br /> GENERAL: If the Contractor desires approval of some material or product other than that specified, he may <br />submit a written request for approval of the substitute item in accordance with the following requirements. <br /> All such requests shall be submitted in four (4) copies and must be made on the "Substitution <br />Request Form", see Section 00 63 25 Substitution Request Form. <br /> No request for approval will be considered unless submitted in accordance with this Section. <br /> Final decision as to whether an item is an equal or satisfactory substitution rests with the Owner. <br /> REQUESTS FOR APPROVAL: Every request for approval must state whether the item offered is an equal or <br />better substitution. Each request for substitution must be referenced to the related specification section and <br />drawing numbers, and be complete with product data/drawings, description of methods, technical and other <br />information. If applicable, include samples showing comparison or physical and other pertinent <br />characteristics as required to establish equivalence of acceptability for the proposed application. Where <br />specific a test results are required by the contract documents, the comparison data for the proposed item <br />shall be based upon the same test methods as those specified, or they shall be correlated to clearly <br />demonstrate comparability. The same warranty described for the specified product is required for the <br />substitution. <br /> DURING BID PERIOD: Request for substitutions will not be considered during the bid period.
The URL can be used to link to this page
Your browser does not support the video tag.