My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT Everett Station HVAC and Controls & Improvements 00 01 10 - 2 <br /> <br />00 01 10 - 2 TABLE OF CONTENTS <br /> <br />01 42 00 References <br />01 45 00 Quality Control <br />01 45 23 Testing and Inspection Services <br />01 50 00 Temporary Facilities and Controls <br />01 55 00 Vehicular Access and Parking <br />01 57 00 Temporary Controls <br />01 72 29 Cutting and Patching <br />01 74 19 Construction Waste Management and Disposal <br />01 74 23 Final Cleaning <br />01 77 00 Closeout Procedures <br />01 78 23 Operation and Maintenance Data <br />01 78 36 Warranties and Bonds <br />01 78 39 Project Record Documents <br /> <br />Technical Construction Subgroup <br /> <br />DIVISION 07 THERMAL AND MOISTURE PROTECTION <br />07 53 30 Elastomeric Sheet Roofing/Mechanically Attached <br />DIVISION 09 FINISHES <br />09 51 00 Acoustic Ceiling Systems <br />09 90 00 Painting <br />DIVISION 20 GENERAL MECHANICAL <br />20 02 00 Operation and Maintenance Manual for Mechanical <br />20 05 00 Common Work Results for Mechanical <br />20 05 03 Existing Systems Work for Mechanical <br />20 05 19 Piping Specialties for Mechanical <br />20 05 29 Hangers and Supports for Mechanical <br />20 05 30 Sleeves and Seals for Mechanical <br />20 05 48 Vibration and Seismic Control for Mechanical <br />20 05 93 Testing, Adjusting, Balancing for Mechanical <br />20 07 00 Mechanical Insulation <br />20 08 00 Commissioning of HVAC <br />DIVISION 22 PLUMBING <br />22 11 00 Facility Water Distribution <br />22 40 00 Plumbing Fixtures <br />DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) <br />23 21 13 Hydronic Piping <br />23 21 28 HVAC Condensate Piping <br />23 23 00 Refrigerant Piping <br />23 31 00 HVAC Ducts and Casings <br />23 33 00 Duct Accessories <br />23 34 00 Fans <br />23 36 00 Air Terminal Units <br />23 37 00 Air Outlets and Inlets
The URL can be used to link to this page
Your browser does not support the video tag.