Laserfiche WebLink
Cost Report <br />4211CNST-CO COE WFP Upgrades Phase 2 Const COModule 10/16/2025 12:41 PM <br />Page 1 of 5Mitchell Sorestad1055IMCO General Construction, Inc. <br />LS1.000100Takeoff Qty: <br />Bid Qty: <br />COATING REPAIRS FLOC BASINBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />787,356.4980,500.000.00370,000.002,712.500.0061,014.70273,129.29100,983.69172,145.60Total <br />787,356.4980,500.000.00370,000.002,712.500.0061,014.70273,129.29100,983.69172,145.60U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0006103.458165.2067298.24112,640.00000.00042,640.0000 <br />LSUnit:1.00Quantity:SUB - Coating100-02Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />200,000.00200,000.00100.000200,000.00LS1.001.00Sub - Long Painting4PNT <br />MOUnit:5.00Quantity:SUB - Containment100-04Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />170,000.00170,000.00100.000170,000.00LS1.001.00SUB - Containment4CONTAIN <br />MOUnit:5.00Quantity:Coating Sub Support Mo Rent100-08Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />417,356.4980,500.000.000.002,712.500.0061,014.70273,129.29100,983.69172,145.60Total <br />83,471.3016,100.000.000.00542.500.0012,202.9454,625.8620,196.7434,429.12U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,742.687417.60000.056888.0000379.70910.0057176.000066,828.7980 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />34,429.1200103.4581528.00000.00192,640.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:40 Hour Week - (4@10)410Calendar: <br />1.50Equipment Pcs:3.00Labor Pcs:880.00Crew Hrs:100.00Eff:176HUProd:(Mod) *** CREW ON FLY ***ZZCrew: <br />Remove Baffles for Manlift Access <br />Remove Wall Angle Stainless Steel where applicable <br />Remove Flocculator Arms <br />Water Control <br />Reinstall Flocculator Arms <br />Reinstall Baffles and Angle Brackets <br />Crane Operator <br />Lift Director <br />Signal Person <br />Rigger <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,712.505.43108.5005.00GAL500.001.00Diesel Fuel3FUEL <br />60,000.0012,000.00100.00012,000.00MO5.001.0050 ton RT5CRANE <br />16,000.003,200.00100.0003,200.00MO5.001.008K Forklift5FL8K <br />4,500.00900.00100.000900.00MO5.001.00Scissor Lift5SCISSOR <br />15,780.8535.87109.75033.08HR440.000.50Takeuchi 135 Excvatr 3.5MT8EX135T <br />45,233.8551.40109.75048.52HR880.001.00Ford F450 Pipefitter8TKJ450P <br />89,227.07101.39100.00063.84MH880.001.00Carpenter ForemanCF <br />86,569.4798.37100.00061.84MH880.001.00Carpenter JourneymanCJ <br />97,332.75110.61100.00069.94MH880.001.00Oper Crane 100-200T G1AOC2