My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 2/17/2026 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 2/17/2026 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:20:09 AM
Creation date
2/24/2026 10:18:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
2/17/2026
Council Approval Date
5/4/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Phase 2 Capital Upgrades
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$1,222,203.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 4 of 510/16/2025 12:41 PMCOE WFP Upgrades Phase 2 Const COModule4211CNST-CO <br />500.00100.00100.000100.00MO5.001.00Copy Machine Supplies91223 <br />MOUnit:5.00Quantity:ST&S-Employee Development025-14Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,640.001.00100.0001.00LBHR2,640.001.00Total Labor Hours9*TH <br />MOUnit:5.00Quantity:ST&S-Project025-20Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />6,600.002.50100.0002.50LBHR2,640.001.00Direct Labor Hours9*DH <br />MOUnit:5.00Quantity:ST&S-Safety025-30Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,980.000.75100.0000.75MH2,640.001.00Safety ST&S91701 <br />995,19480,50056,222370,0002,713061,015424,744101,628323,117Total <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />Report Summary <br />https://webgis.dor.wa.gov/taxratelookup/SalesTax.aspx <br />Master Estimate Version 2018.0207 used to create job estimate. *** Master Estimate Wages based on King Co. Prevailing Wage Rates Labor <br />Codebook Version 2017.1129. *** Master Equipment Rates based on Equipment Codebook Version 2018.0716. <br />************Estimate created on: 12/20/2018 by User#: 1008 - Jamie Howard <br />Source estimate used: P:\HEAVYBID\EST\ESTMAST2018 <br />************Estimate created on: 01/21/2019 by User#: 1008 - Jamie Howard <br />Source estimate used: P:\HEAVYBID\EST\ZESTMAST2019 <br />************Estimate created on: 02/07/2020 by User#: 1008 - Jamie Howard <br />Source estimate used: P:\HEAVYBID\EST\ESTMAST2019 <br />************Estimate created on: 02/10/2021 by User#: 1008 - Jamie Howard <br />Source estimate used: P:\HEAVYBID\EST\ESTMAST2020 <br />************Estimate created on: 01/10/2022 by User#: 1008 - Jamie Howard <br />Source estimate used: P:\HEAVYBID\EST\ESTMAST2021 <br />************Estimate created on: 01/16/2023 by User#: 1020 - Ryan Mitchell <br />Source estimate used: P:\HEAVYBID\EST\ESTMAST2022 <br />************Estimate created on: 03/24/2023 by User#: 1020 - Ryan Mitchell <br />Source estimate used: P:\HEAVYBID\EST\ESTMAST2023 <br />************Estimate created on: 06/08/2023 by User#: 19 - Todd Pike <br />Source estimate used: P:\HEAVYBID\EST\23-013 <br />************Estimate created on: 12/12/2023 by User#: 19 - Todd Pike <br />Source estimate used: P:\HEAVYBID\EST\23-026 <br />************Estimate created on: 02/23/2024 by User#: 19 - Todd Pike <br />Source estimate used: P:\HEAVYBID\EST\23-026R1 <br />************Estimate created on: 04/23/2024 by User#: 19 - Todd Pike <br />Source estimate used: P:\HEAVYBID\EST\4211GMPWIP <br />************Estimate created on: 10/01/2025 by User#: 1042 - Casey Russell <br />Source estimate used: P:\HEAVYBID\EST\4211CNSTBDGT <br />Job Notes <br />Calendars Used In Estimate
The URL can be used to link to this page
Your browser does not support the video tag.