My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 2/17/2026 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 2/17/2026 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:20:09 AM
Creation date
2/24/2026 10:18:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
2/17/2026
Council Approval Date
5/4/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Phase 2 Capital Upgrades
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$1,222,203.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />Mitchell Sorestad <br />From:Kevin Parker <kevinp@longpainting.com> <br />Sent:Friday, September 26, 2025 10:56 AM <br />To:Mitchell Sorestad <br />Cc:Jonathan Holca; Shaun McDeavitt <br />Subject:Everett Coating Repairs - ROM <br />Follow Up Flag:Follow up <br />Flag Status:Completed <br />Categories:Bills <br />Hi Mitchell, <br /> <br />I've prepared a ROM for your review estimating the costs of the repairs we discussed in our meeting on <br />Wednesday. I've separated the work into two categories - the Dynamic Cracks that run from floor to <br />ceiling of each basin wall, and the Static Cracks with Moisture Ingress in Basin 4 specifically. For the <br />Dynamic Cracks, the ROM for all basins is $130,000. For the Static Crack Repair in Basin 4, the ROM <br />is $70,000. Clarifications and Assumptions are as follows, based on our meeting on Wednesday: <br /> IMCO covers all containment. I have included a month of DH/Heating rental in the Static Repairs <br />and two months of DH/Heating in the Dynamic Repairs. It is assumed we'll be able to hard-wire <br />into local power and will not need diesel to power the DH. <br /> QC/Inspection time and Mobilization is included in the ROMs. <br /> Trade Damage that may occur after the repairs are complete, during the process of bringing the <br />basins online for water treatment, is excluded. The trade damage repairs that have already been <br />completed in Basins 1 and 2 in June/July are also not included in these ROMs. <br /> Assumed that, alongside containment, appropriate steps will be taken to ensure water does not <br />leak from other basins, inlets, or outlets into work areas, before work begins. <br /> Assumed that appropriate time will be given after containment is up for work areas to dry out as <br />appropriate for coating application, and that containment will remain in place with DH/heating for <br />appropriate cure times as per Series 21 product data. <br /> Repair work will be completed according to TNEMEC Recommendations for Crack Repairs, <br />detailed below: <br />o Static Cracks with Moisture Ingress, Basin 4 only: <br />A. Clean areas per SSPC-SP1 <br />B. Rout out crack to minimum 1/4''x1/4'', completely remove & clean debris <br />C. Saw Cut 1/8''x1/8'' keyway out at least 3 inches of both sides of crack (Note: for areas with <br />groups of cracks, keyways will be formed around the entire group to prevent excessive <br />overlapping and enhance the visual quality of repairs, as discussed in our meeting <br />Wednesday 9/24). <br />D. Fill Crack & Keyways using Tnemec Series 215 Epoxy Putty <br />E. Apply Tnemec S21 over the area. Ensure all repair areas satisfy original specified dry film <br />thickness. <br />Dynamic Cracks in all Basins <br />A. Clean areas per SSPC-SP1
The URL can be used to link to this page
Your browser does not support the video tag.