City of Everett 00 63 63 - 2 <br />Water Filter Plant – Phase 2 Capital Upgrades WO #3763 <br />Page 2 of 4 <br /> <br /> <br />Change Order No. 1 <br />Change Order Effective Date: 2/4/26 <br /> <br /> <br />Contractor and City agree as follows: <br />1. The scope of Work shall be changed to the extent described in Exhibit A. <br />2. The amount of this Change Order for the changes described in Exhibit A, represents <br />complete compensation for the changes described in Exhibit A, including all direct and <br />indirect costs and impacts. The Contract Sum shall be adjusted as described in this Change <br />Order. <br />3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the Mayor or <br />his designee is authorized to direct Contractor to perform additional work. In calculating such <br />threshold amounts, Washington State sales tax, as applicable to the Work, has been <br />considered. <br />4. The Contract Time of the Contract shall be adjusted to the extent described in this Change <br />Order. <br />5. Contractor waives and releases any and all claims arising out of, or related to, this Change <br />Order, the work described in Exhibit A, and all work and actual or constructive changes that <br />occurred or began prior to the date of this Change Order, including, but not limited to, claims <br />for equitable adjustment of time and compensation, delay, impact, overhead, or <br />inefficiencies. This provision does not apply to requests for equitable adjustment of time or <br />price for which the Contractor timely and properly provided notice of a differing site condition, <br />protest, dispute, claim or Contract Claim as required by the Contract Documents. If the <br />Contract Documents establish a time period for notice of a differing site condition, protest, <br />dispute, claim, or Contract Claim that ends after the date of this Change Order, but relates to <br />work performed prior to the date of this Change Order, then this provision does not apply if <br />the Contractor timely and properly submits such notice <br />6. This Change Order only changes the contract between Contractor and City to the extent <br />explicitly provided herein. <br />7. Signature(s) on this Change Order may be by pdf, email, fax or other electronic means, in <br />which case such signature(s) will have the same effect as an original ink signature. This <br />Change Order may be signed in counterparts, each of which shall be deemed an original, <br />and all of which, taken together, shall be deemed one and the same document.