My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 2/17/2026 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 2/17/2026 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:20:09 AM
Creation date
2/24/2026 10:18:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
2/17/2026
Council Approval Date
5/4/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Phase 2 Capital Upgrades
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$1,222,203.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
(E) EXPANSION JOINTOUTLET CHANNEL 2OUTLET CHANNEL 2OUTLET CHANNEL 2OVERFLOW CHANNELOUTLET CHANNEL 1OUTLET CHANNEL 1(E) OUTLET BOX <br />(E) EXPANSION JOINT <br />(E) EXPANSION JOINT <br />(E) EXPANSION JOINT <br />(E) BASIN 1 <br />(E) BASIN 2 <br />(E) BASIN 3 <br />(E) BASIN 4 <br />(E) EXPANSION JOINT(E) INLET DISTRIBUTION CHANNEL3' - 0" <br />9' - 0" <br />1' - 3" (VIF) <br />(VIF) <br />5' - 9" <br />B <br />S121 <br />C <br />S122 <br />A <br />S121 <br />D <br />S122 <br />(E) GUARDRAIL, TYP <br />(E) STRUCTURE (N) STRUCTURE <br />1' - 6"(NEW WALL)1' - 6" <br />1' - 6" <br />(E) EXPANSION JOINT <br />GUARDRAIL AND TRANSITION <br />OF NEW TO (E) GUARDRAIL BY <br />GUARDRAIL SUPPLIER, TYP. <br />(E) GUARDRAIL, TYP. <br />(N) GUARDRAIL, <br />TYP.C10x8.3612' - 9"13' - 0"5' - 0"5' - 5"12' - 7"C10x8.36C10x8.36C10x8.36 <br />C10x8.36C10x8.36 <br />C10x8.36C10x8.36 <br />13' - 6"12' - 9"4' - 7"14' - 0"12' - 7"1' - 7"13' - 3"9' - 1"CJ CJC10x8.36C10x8.36C10x8.36C10x8.36 <br />C10x8.36 <br />C10x8.36 <br />C10x8.36 <br />C10x8.36 <br />C10x8.36 <br />C10x8.36C10x8.36C10x8.36C10x8.36C10x8.36C10x8.36 C10x8.36 <br />STRONG SPAN <br />OF GRATING <br />(N) GUARDRAIL, <br />TYP <br />GUARDRAIL AND TRANSITION <br />OF NEW TO (E) GUARDRAIL BY <br />GUARDRAIL SUPPLIER, TYP. <br />C10x8.36 <br />(N) GUARDRAIL, <br />TYP <br />C10x8.36 <br />C10x8.36GUARDRAIL AND TRANSITION <br />OF NEW TO (E) GUARDRAIL BY <br />GUARDRAIL SUPPLIER, TYP. <br />CJ <br />STRONG SPAN <br />OF GRATING8' - 11"GRATING SUPPORT LEDGER <br />PER DETAIL TYP. <br />GRATING SUPPORT LEDGER <br />PER DETAIL TYP. <br />S123 <br />2 <br />S123 <br />3 <br />S123 <br />3 <br />SD961 <br />2 <br />10' - 6" <br />NEW EXPANSION JOINT <br />SD961 <br />2 <br />Of Total <br />Sheet No. <br />Drawing <br />REGION -10 | STATE -WA <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />everettwa.govACTIONAPRVDDATEACTIONAPRVDDATE <br />BID CONST <br />Design Review Level <br />RECORD <br />Plot datePlotted by Kennedy Jenks Last saved by Kennedy Jenks Plot style Not Applicable Sheetset Name Not ApplicableXSurveyed By | Date | Control Monument | City of Everett Field Book/Starting Page |/|0 <br />0 <br />25mm <br />1" <br />IF THIS BAR IS NOT <br />DIMENSION SHOWN, <br />ADJUST SCALES <br />ACCORDINGLY.7/12/2023 10:44:40 PMSCALE: 1/8" = 1'-0" <br />90% <br />PB <br />ZS <br />JW <br />STRUCTURAL <br />FLOCCULATION BASIN <br />TOP PLAN <br />S112 <br />Filepath\Filename <Copy and Paste from Projectwise File Path bar>WATER FILTER PLANT <br />PHASE 2 CAPITAL UPGRADES <br />WORK ORDER 3763NO. DATE APRVD REVISION <br />1. REFERENCE STRUCTURAL DRAWING SHEETS SD951 THROUGH <br />SD956 FOR STANDARD DETAILS. <br />2. FOR SUBGRADE PREPARATIONS AND GROUND IMPROVEMENTS <br />REFERENCE THE GEOTECHNICAL DRAWINGS. <br />3. COORDINATE ALL FOUNDATION AND WALL PENETRATIONS <br />WITH THE CIVIL, MECHANICAL, AND ELECTRICAL DRAWINGS. <br />NOTIFY THE ENGINEER OF RECORD OF ANY DISCREPENCIES. <br />4. ALL DIMENSIONS AND SIZES SHOWN ARE APPROXIMATE AND <br />PROVIDED AS AN AID IN INTERPRETING THE ANTICIPATED <br />EXISTING CONDITIONS. "VIF" INDICATES VERIFY IN FIELD. <br />VERIFY ALL DIMENSIONS SHOWN WITH EXISTING CONDITIONS. <br />5. VERIFY ALL EXISTING CONDITIONS PRIOR TO ORDERING OR <br />FABRICATING ANY MATERIALS. NOTIFY THE STRUCTURAL <br />ENGINEER OF RECORD OF ANY POSSIBLE DISCREPENCIES <br />BEFORE CONSTRUCTION. <br />6. DO NOT DAMAGE, OVERCUT, SCRATCH, OR CRACK ANY <br />PORTION OF THE EXISTING STRUCTURE NOT INTENDED TO BE <br />MODIFIED. PROTECT AND PRESERVE PORTIONS OF THE <br />EXISTING STRUCTURE NOT INTENDED TO BE MODIFIED. <br />7. GRATING SHALL BE 2-1/2" DEEPx 3/16" THICK (PRESS-LOCKED) <br />WITH BEARING BARS @ 1-3/16", ALUMINUM ALLOY TYPE 6063- <br />T6 GRATING, BY MCNICHOLS BAR GRATING (SERIES GBB-250, <br />19-P-2) OR APPROVED EQUAL. GRATING SHALL BE SERRATED <br />WITH A MILL FINISH. <br />NOTES <br />FLOCCULATION BASIN - TOP PLAN <br />SCALE: 1/8" = 1'-0" <br />PRELIMINARY <br />NOT FOR <br />CONSTRUCTION90% <br />Move scaffolding from basins 3 & 4 to basins 1 & 2. <br />Scaffolding installed over basins 3 & 4 first.
The URL can be used to link to this page
Your browser does not support the video tag.