My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 2/17/2026 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 2/17/2026 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:20:09 AM
Creation date
2/24/2026 10:18:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
2/17/2026
Council Approval Date
5/4/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Phase 2 Capital Upgrades
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$1,222,203.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Date Description Hours Cost <br /> Billing Rates - For equ, <br />use fueled rates to <br />increase GMP <br />Markups Totals <br /> 01/13/25 Carpnter/J Emp 21235/McCarthy, Justin 2.00 93.38$ 186.76$ <br /> 01/13/25 Carpnter/J Emp 21491/Aparicio Mejia, Jose 4.00 93.38$ 373.52$ <br /> 01/15/25 Carpnter/J Emp 21473/Hoglund, Zachary 6.00 93.38$ 560.28$ <br /> 01/15/25 CarpFore/J Emp 21225/Sterling, Jeremiah 5.00 96.40$ 482.00$ <br /> 01/15/25 Carpnter/J Emp 21235/McCarthy, Justin 8.00 93.38$ 747.04$ <br /> 01/15/25 Carpnter/J Emp 21491/Aparicio Mejia, Jose 8.00 93.38$ 747.04$ <br /> 03/31/25 Carpnter/J Emp 21473/Hoglund, Zachary 10.00 93.38$ 933.80$ <br /> 03/31/25 CarpFore/J Emp 21225/Sterling, Jeremiah 1.00 96.40$ 96.40$ <br /> 03/31/25 Carpnter/J Emp 21491/Aparicio Mejia, Jose 10.00 93.38$ 933.80$ <br /> 03/31/25 Carpnter/J Emp 21491/Aparicio Mejia, Jose 0.03 OT 140.07$ 4.20$ <br />54.03 5,064.84$ <br /> 01/15/25 CarpFore/J Emp 21225/Sterling, Jeremiah ZC2111/40' High Cube Storage 10.00 5.68$ 56.80$ <br /> 03/31/25 CarpFore/J Emp 21225/Sterling, Jeremiah ZL2115/Scissor Lift 10.00 33.15$ 331.50$ <br /> 03/31/25 CarpFore/J Emp 21225/Sterling, Jeremiah ZL2116/Scissor Lift 10.00 33.15$ 331.50$ <br />30.00 719.80$ <br /> 01/15/25 Back01-15/J Emp 20862/Eddings, Cory HE0697/Scissor Lift 19ft 30-32in Elec./1 10.00 33.15$ 331.50$ <br /> 01/15/25 CarpFore/J Emp 21225/Sterling, Jeremiah LP0669/2021 Light Tower Towable/1 10.00 9.01$ 90.10$ <br /> 01/15/25 CarpFore/J Emp 21225/Sterling, Jeremiah ST0295/2022 Ford F450/1 5.00 35.86$ 179.30$ <br /> 03/31/25 CarpFore/J Emp 21225/Sterling, Jeremiah AC1824/2021 Sullivan 185CFM Diesel Air Compressor/1 10.00 53.61$ 536.10$ <br /> 03/31/25 CarpFore/J Emp 21225/Sterling, Jeremiah FL0533/2013 Genie 8000# Reach/1 10.00 157.88$ 1,578.80$ <br /> 03/31/25 CarpFore/J Emp 21225/Sterling, Jeremiah HE0697/Scissor Lift 19ft 30-32in Elec./1 10.00 33.15$ 331.50$ <br /> 03/31/25 CarpFore/J Emp 21225/Sterling, Jeremiah ST0295/2022 Ford F450/1 1.00 35.86$ 35.86$ <br /> 03/31/25 CarpFore/J Emp 21225/Sterling, Jeremiah UV0122/2022 Yanmar YUC70LPXNR Utility Vehicle/1 10.00 6.00$ 60.00$ <br /> 03/31/25 CarpFore/J Emp 21225/Sterling, Jeremiah WD0738/2011 Welder ARC 300 AMP (Field)/1 10.00 7.32$ 73.20$ <br />76.00 3,216.36$ <br />9,001.00$ <br />Total for Cost Type: 5 <br />Total for Cost Type: 6 <br />FA - Back-Gouging Existing Metal Embedded Items <br />TOTAL COP <br /> 989- 13- FA - Back-Gouging Existing Metal Embedded Items 1 L <br />IMCO JC Detail <br /> 989- 13- FA - Back-Gouging Existing Metal Embedded Items 5 R <br /> 989- 13- FA - Back-Gouging Existing Metal Embedded Items 6 E <br />Total for Cost Type: 1
The URL can be used to link to this page
Your browser does not support the video tag.