My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 2/17/2026 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 2/17/2026 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:20:09 AM
Creation date
2/24/2026 10:18:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
2/17/2026
Council Approval Date
5/4/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Phase 2 Capital Upgrades
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$1,222,203.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PROJECT: City of Everett <br />WFP Phase 2 Capital Upgrades WO No. 3763 <br /> <br />WORK CHANGE DIRECTIVE – No. 03 <br />DATE OF ISSUANCE: February 28, 2025 <br /> <br />You are directed to proceed promptly with the following change (s): <br /> <br />Description: Additional surface preparation on the north two trains of the flocculation basin <br />as required prior to application of final coating system. <br /> <br />Purpose of WCD-03: Additional surface preparation was required on the north two trains of <br />the flocculation basin to prepare substrate for application of the final coating system. WCD-03 <br />is intended to pay for costs of additional surface prep up to 2/22/25 per the attached <br />documentation. Future costs of additional surface preparation will be included on future work <br />change directives. A future budget reallocation will be executed to formally track funds paying <br />for WCD-03 once the source of said funds, whether they be from City of Everett allowance or <br />IMCO contingency funds, has been determined. <br /> <br />If a claim is made that the above change(s) have affected Contract Price or Contract Times, any <br />claim for a Change Order based thereon will involve one or more of the following methods of <br />determining the effect of the change(s). <br /> <br />Method of determining change Method of determining change <br />In Contract Price: in Contract Times: <br /> <br /> Lump Sum Contractor’s records <br /> <br /> Time and Material Engineer’s records <br /> <br /> Other - Other – N/A <br /> <br /> <br />Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: <br />$180,202.37 Substantial Completion 0 days: <br />If the change involves an increase, the Ready for final payment 0 days: <br />estimated amount is not to be exceeded If the change involves an increase, the <br />estimated without further authorization. times are not to be exceeded without further authorization. <br /> <br /> <br />ACCEPTED: IMCO General Construction AUTHORIZED: City of Everett <br /> <br />By: Date: By: Date: (Authorized Signature) (Authorized Signature) <br />Page 1 of 1 <br />2/28/25
The URL can be used to link to this page
Your browser does not support the video tag.