My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Osborn Consulting 2/18/2026 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Osborn Consulting 2/18/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:22:47 AM
Creation date
2/24/2026 10:22:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Osborn Consulting
Approval Date
2/18/2026
Council Approval Date
2/11/2026
End Date
12/31/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Regional Stormwater Facility Study
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003951
Total Compensation
$54,566.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
P a g e | 3 <br />Regional Stormwater Facility Planning – Amendment 1 <br />▪A detailed site review of the catchment will be conducted to select a Best Management Practice. <br />Deliverables <br />▪Updated Draft Regional Facility Planning Report <br />Task 6 Optional Services <br />The Consultant and City may continue to identify additional topics that need analysis and/or additional <br />deliverables. This task is to cover additional work, only after written approval by the PM. <br />Consultant Responsibilities <br />▪Written request for support <br />Assumptions <br />▪The allowance for this Task is up to an additional $9,998. <br />▪The City PM must provide written approval prior to Consultant performing work under this task. <br />This written approval will include the agreed number of hours to be used on this task for the <br />specific work approval. There may be several approvals under this task. <br />Deliverables <br />▪As defined with City’s written approval. <br />Client Responsibilities <br />▪Review and approval of written requests to leverage the Optional Services. <br />Task 7 SMAP Support <br />The task includes support to the City on their upcoming SMAP project, other City planning efforts, and the <br />delivery of the GIS model from the regional stormwater facility planning effort. This tasks is not grant <br />funded. <br />Consultant Services <br />▪GIS Model <br />Deliver the GIS model previously developed by Osborn (under Task 3) to support the regional <br />stormwater facilities prioritization. Finalizing the GIS model for delivery will include the <br />following: <br />♦Updating naming conventions in the GIS model for consistency <br />♦Removing dated input data from the GIS model and packaging the GIS model for <br />delivery <br />♦Writing a summary of methodology memorandum. <br />♦Meeting with City GIS Staff to transition the GIS model to the City <br />▪Site prioritization recalculation <br />Recalculate prioritization scores based on the revised Stormwater Management Influence <br />(SMI) score methodology developed as part of the Regional Stormwater Facility Plan for <br />specific sites provided by the City.
The URL can be used to link to this page
Your browser does not support the video tag.