My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 MERRILL CREEK PKY CREATION TECHNOLOGIES 2026-03-12
>
Address Records
>
MERRILL CREEK PKY
>
6300
>
CREATION TECHNOLOGIES
>
6300 MERRILL CREEK PKY CREATION TECHNOLOGIES 2026-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 10:34:41 AM
Creation date
2/27/2026 3:09:47 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6300
Tenant Name
CREATION TECHNOLOGIES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tntertek Professional Service Industries,Inc. Report No: SID:07123189-2-01 <br /> 16750 Woodinville Redmond Rd NE Issue No: 1 <br /> Woodinville,WA 98072 <br /> S1 Phone:(425)409-2504 These test results apply only to the specific locations and materials <br /> noted and may not represent any other locations or elevations.This <br /> report may not be reproduced,except in full,without written <br /> permission by Professional Service Industries, Inc.If a non- <br /> compliance appears on this report,to the extent that the reported <br /> Special Inspection Dail Field Report non-compliance impacts the project,the resolution is outside the <br /> PSI scope of engagement.Tests and inspections are considered to <br /> Client: AIRGAS USA LLC CC: be simple acceptance criteria unless noted otherwise. <br /> 11900 NE 95TH ST TOM MATTAM <br /> VANCOUVER, WA 98682 <br /> aril»� <br /> Project: CREATION TECH ANCHORS(AIRG <br /> EVERETT, WA 98203 Approved Signatory: Carlos Perez <br /> Date of Issue: 10/1/2025 <br /> General Details <br /> Date: 9/30/2025 General Contractor: Air Gas <br /> Permits: Tank 2507-004 Weather: Sunny <br /> Type of Inspection Performed <br /> ❑ Reinforced Concrete ❑ Structural Masonry ❑ High Strength Bolting ❑ Fireproofing <br /> ❑ Reinforcing Steel ❑ Soils ❑ Welding ❑� Other <br /> ❑✓ New Inspection ❑ Re-Inspection <br /> Standby Time: <br /> Field Observations & Comments <br /> 0 Special Inspection ❑� Continuous ❑ Periodic <br /> Location(s)/Item(s): <br /> Creation Technology <br /> Reference Details/Drawings: <br /> Everett Permit Service notes cover sheet <br /> Remarks: <br /> Observed the placement of(4) 3/4" diameter 16" long anchor rods HAS-V-36 HDG (ASTM 1554 GR 36. Contractor drilled <br /> 4 holes using a 7/8" diameter drill bit, these holes were 12" deep and all holes were cleaned out per the epoxy <br /> manufactures requirements prior to the placement of the epoxy. the Epoxy was HILTI HIT-RE 200 V3 with an exp date of <br /> 2026/May/31 Lot# 15753068. these bolts were installed at the base of the PERMACYL 5500 VHP N2 TANK. <br /> To the best of PSI's knowledge, the work inspected to the approved construction documents are: <br /> 0 Conforming ❑ Non-Conforming <br /> Inspector: John Cleary Inspector Cert No.: SI 02660 <br /> Jobsite Representative: Wyatt <br /> ©2000-2025 QESTLab by SpectraQEST.com Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.