Laserfiche WebLink
COMMERCIAL BUILDING Permit Number: B2506-093 <br /> PERMIT Permit Type: COMMERCIAL BUILDING <br /> Permit Subtype: COMMERCIAL RE-ROOF <br /> EVERETT City of Everett Permit Services Date Issued: 7/18/2025 <br /> WASHINGTON PermitServices@everettwa.gov 1425.257.8810 Request Inspections:OnIine Perm its.everettwa.gov <br /> PERMIT INFORMATION: <br /> SITE ADDRESS: 1930 MERRILL CREEK PKWY PARCEL#: 28040200400700 <br /> DESCRIPTION: Seaway Ridge Power Shed Re-Roof TENANT: SEAWAY RIDGE SHARED POWER <br /> SHED <br /> PERMIT VALUATION: $6,763.00 <br /> Installation of 50mil, Duro-Last,Single-Ply PVC Membrane over one existing layer of BUR <br /> CONTACT INFORMATION: <br /> OWNER:SEAWAY RIDGE LLC PHONE: <br /> MAILING ADDRESS: 16108 INGLEWOOD TER NE KENMORE,WA 98028 EMAIL: <br /> APPLICANT: Lauren Binford PHONE: (206)587-6211 <br /> MAILING ADDRESS: PO Box 2170 Snohomish,WA 98291-2170 EMAIL:accounting@altroofing.com <br /> CONTRACTOR:ALTERNATIVE ROOFING SYSTEMS IN PHONE:(206)587-6211 <br /> MAILING ADDRESS: PO Box 2170 Snohomish,WA 98291-2170 EMAIL: accounting@altroofing.com <br /> STATE CONTRACTOR'S LIC#:ALTERRS90OPH EVERETT BUSINESS LIC#:64607 <br /> PERMIT FEES: <br /> DESCRIPTION PAID AMOUNT DATE PAID <br /> Percent Credit Card Fee $3.76 6/25/2025 <br /> Percent Credit Card Fee $5.59 7/18/2025 <br /> STATE SURCHARGE IBC/IEBC $2S.00 7/18/2025 <br /> BUILDING DEPT REVIEW FEE $163.43 6/25/2025 <br /> BUILDING PERMIT CONSTRUCTION FEE $217.90 7/18/2025 <br /> $415.68 <br /> PERMIT CONDITIONS: <br /> CONDITION TYPE CONDITION DETAILS <br /> CITY STANDARDS All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications for Development. <br /> BLDG-NO CHANGE IN ROOF HEIGHT No change to roof height or pitch is approved under this permit. <br /> PLNG-APPROVAL FOR SCOPE OF WORK ONLY This permit is granted for the described scope of work only.Issuance of this permit does not recognize any use and/or <br /> structure of the property that may not meet current Unified Development Code standards. <br /> INSPECTION SCHEDULING Inspections are required for all stages of construction and shall be scheduled online.Visit the City's online Permitting <br /> Portal athttps://onlinepermits.everettwa.gov to formally request all required inspections.Available inspection dates are <br /> shown in the dropdown menu. <br /> SUBJECT TO FIELD INSPECTION All work shall be subject to field inspection. <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all claims for <br /> damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other right-of-way use here to <br /> applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br /> E <br /> EVERETT Permit Number: B2506-093 Page 1 of 2 <br />