Laserfiche WebLink
DEMOLITION Permit Number: D2503-004 <br /> PERMIT Permit Type: DEMOLITION <br /> Permit Subtype: DEMOLITION (RESIDENTIAL <br /> EVERETT PROPERTY) <br /> City of Everett Permit Services Date Issued: 4/10/2025 <br /> WASHINGTON PermitServices@everettwa.gov 1 425.257.8810 <br /> Request Inspections: OnlinePermits.everettwa.gov <br /> PERMIT CONDITIONS: <br /> CONDITION TYPE CONDITION DETAILS <br /> DEMOLITION WORK ONLY This permit for demolition/removal of building structure only.No site work,clearing,grading,excavating,or earthwork <br /> permitted except to restore building pad after demolition.Building pad area shall be graveled or re-vegetated.No <br /> exposed soils permitted. <br /> APPROVED PLANS TO REMAIN ON SITE Approved plans must remain on job site at all times.All work shall be constructed per the plans approved by the City of <br /> Everett Permit Services. <br /> INSPECTION SCHEDULING Inspections are required for all stages of construction and shall be scheduled online.Visit the City's online Permitting <br /> Portal at https:Honlinepermits.everettwa.gov to formally request all required inspections.Available inspection dates are <br /> shown in the dropdown menu. <br /> ELECTRICAL PERMIT REQUIRED All existing electrical services shall first obtain an ELECTRICAL ONLINE permit,and then disconnect electrical service prior <br /> to demolition. <br /> ASBESTOS ABATEMENT Asbestos Abatement is required in line with Puget Sound Clean Air Agency(PSCAA)https:HPscleanair.gov/.An <br /> Asbestos/Demolition Notification must be submitted to PSCAA before any asbestos removal or demolition begins and <br /> have the appropriate abatement report documentation on-site during construction.The applicant is responsible for <br /> compliance with all local,state,and federal laws,codes,and regulations whether or not described herein.By selecting <br /> Acknowledged from the drop-down menu,I,the owner/applicant,acknowledge my responsibility,agree to the terms <br /> and conditions of this requirement,and will abide by the requirements during construction. <br /> LEAD PAINT ABATEMENT Contact the Snohomish Health District(SHD)https://www.snohd.org/for applicable lead paint abatement requirements. <br /> The applicant is responsible for compliance with all local,state,and federal laws,codes,and regulations whether or not <br /> described herein.By selecting Acknowledged from the drop-down menu,I,the owner/applicant,acknowledge my <br /> responsibility,agree to the terms and conditions of this requirement,and will abide by the requirements during <br /> construction. <br /> RODENT ABATEMENT Proper rodent abatement shall be conducted prior to demolition.The applicant is responsible for compliance with all <br /> local,state,and federal laws,codes,and regulations whether or not described herein.By selecting Acknowledged from <br /> the drop-down menu,I,the owner/applicant,acknowledge my responsibility,agree to the terms and conditions of this <br /> requirement,and will abide by the requirements during construction. <br /> SIDE SEWER CAPPING All existing connected side sewers shall first obtain a separate utility permit for a side sewer cap-off and then be capped <br /> at the property line prior to demolition of the structure. <br /> WATER SERVICE CAPPING All existing connected water services shall be capped at the back side of the meter prior to demolition. <br /> EROSION CONTROL(TESC) Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector <br /> and the approved SWPPP/TESC Plan.Remove upon completion of the project prior to final approval of the permit. <br /> STREET CLEANING Keep City streets clean at all times.No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> SUBJECT TO FIELD INSPECTION All work shall be subject to field inspection. <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all claims for <br /> damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other right-of-way use here to <br /> applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br /> VALIDITY/EXPIRATION: <br /> Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion.This permit <br /> may be canceled by the city upon any stoppage of work on this project over 180-day duration.Each inspection extends the expiration date 180 days to keep the <br /> permit open while work is active. <br /> EVERETT Permit Number: D2503-004 Page 2 of 2 <br />