Laserfiche WebLink
Anita Chen <br /> From: Anita Chen <br /> Sent: Friday,January 24, 2025 3:49 PM <br /> To: jeff@modularelectric.net <br /> Cc: Permit Services <br /> Subject: B2501-043: Follow-up to phone call: INTAKE REVIEW <br /> Good afternoon,Jeff, <br /> talked to one of our structural reviewers: <br /> • We need to see engineering calculations. I would reach out the manufacturer to see if they have <br /> calculations for the specific footing being installed. <br /> • The cut sheet doesn't show how deep the footing is in the ground. It also does not specify the bolt size and <br /> dimensions.There are a lot of"as needed"or"as required".We would need the manufacturer to provide <br /> more specific details to exactly what is being installed. <br /> • The pole cut sheets,which I mentioned, are needed. <br /> • The site plan doesn't show the location for the power connections. <br /> Let us know if you have any other questions. <br /> Additional information can either be sent to PermitServices(cbeverettwa.gov or added to the portal. <br /> The important step is to send a transmittal sheet(PDF)(hyperlinked)to PermitServices(cOeverettwa.gov when you <br /> have submit all the information. <br /> — Anita Chen <br /> Building Plan Review Technician I Permit Services <br /> 425.257. 88101 3200 Cedar Street, 2nd Floor, Everett, WA 98201 <br /> EVERETT Phone Hours: M/W/Th: 8:30 a.m.—12 p.m. & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I onlinepermits.everettwa.gov <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />