Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 6/28/2024 <br /> City of Everett Permit Services Public Works Permit#: PW2406-025 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> EV E R E T T Everett, WA 98201 Planning Reference#: <br /> everettwa.gov/permits Public Works Fee: $135.00 <br /> WASHINGTON Perm itSeryices@eyerettwa.goy Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> NOVOAGLOBAL, INC. TRANSPORTATION SYSTEMS(ELEC) INC <br /> 8018 SUNPORT DRIVE,STE. 203 6917 166TH AVE E <br /> ORLANDO, FL 32809 SUMNER,WA 98390 <br /> PHONE: PHONE: 2537500284 <br /> SITE ADDRESS:713 SE EVERETT MALL WAY TAX PARCEL ID#:28051800305600 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION: Installation of Photo Enforcement Cameras <br /> NOTES: Installation of Photo Enforcement Camera <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Lane closure shall be implemented per attached approved traffic control plan and City of Everett Standards 700 Series. <br /> 5. Hours of operation: Lane closures not allowed 2:30pm to 5:30pm. <br /> 6. Sidewalk:Contractor shall have spotters assist pedestrians through work area whenever possible. If sidewalk must be closed to foot traffic, <br /> then 119-10 SIDEWALK CLOSED AHEAD USE OTHER SIDE or R9-11 SIDEWALK CLOSED AHEAD CROSS HERE at either end of the block or closest <br /> legal crosswalk.When closed sidewalk shall be blocked by physical means such as construction fence or barricades and R9-9 SIDEWALK <br /> CLOSED signs are required at both ends of work area per City of Everett Standard Drawing 726. <br /> 7. All work including Traffic Control must be done in accordance with MUTCD Standards and the attached plans approved by City of Everett. <br /> 8. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 9. Street restoration must be done per COE Standard Drawing#326 and trench restoration per#614,or as directed by the City PW Inspector. <br /> Permanent restoration must be completed within 2 weeks of completion of utility work. <br /> 10. Full lane width grind and overlay is required for trenches greater than 100'in length,multiple cuts within a 100'length section,and/or as <br /> directed by the City PW Inspector. <br /> 11. A minimum of 5ft separation between City of Everett utilities and directional boring/pavement cuts shall be maintained. <br /> 12. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br /> request all required inspections. Inspections are required for job start notification, potholing all City utilities,evaluation of traffic control set- <br /> up,to view the work prior to backfill,and after final restoration to final the permit. Request a final inspection online by selecting PW 25-Site <br /> Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> 13. Potholing required for all crossings over/under City of Everett water mains. <br /> 14. Coordinate with adjoining businesses/homeowners to minimize obstruction of commerce/access. <br /> 15. Noise from temporary construction sites is not allowed 10:OOPM—7:OOAM weekdays,6:OOPM—8:OOAM weekends unless a variance has <br /> been issued.Construction projects wishing a variance from the noise ordinance must submit an application at least 30 days prior to <br /> commencing work. Please visit the following website for more information https://everettwa.gov/1545/Noise-Administration <br /> PERMIT FEE BREAKDOWN: <br /> Erosion Control.......................................................................$50.00 <br /> Paving(Min.Charge)..............................................................$45.00 <br /> PW Plan Review......................................................................$20.00 <br /> PW Site Inspection.................................................................$20.00 <br /> Page 1 of 2 <br /> _APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />