My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 3/17/2026 Change Order 1
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Colacurcio Brothers, Inc. 3/17/2026 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2026 1:41:24 PM
Creation date
3/17/2026 1:41:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
3/17/2026
Council Approval Date
3/12/2025
End Date
2/10/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Mall Bus Platform
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0004733
Total Compensation
$150,208.14
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A Date:3/6/2026 <br />Change Order No. 1 - Everett Mall Bus Platform Project - MALLSTN-24462 <br />Line <br />No.Construction Change Directives Amount Change Order <br />1 Northern Curb Modifications not included in original scope 72,839.15$ COP #1 <br />2 Brasco Shelter Logo Additions at request of Everett Transit not included in scope 3,938.55 COP #2 <br />3 Unforseen Electrical Modification for Change in Vault Size 20,427.27$ COP #3/4 <br />4 Electrical Modifications to Install Safety Monitors in Bathrooms at request of Everett Transit 2,283.31 COP #5 <br />5 Priming and Painting Ceilings at request of Everett Transit 795.00 COP #6 <br />6 Furnish and Install Access Management Controls at request of Everett Transit 25,822.27 COP #8 <br />7 Expansion Joint Color Change at request of Everett Transit 4,971.77 COP #9 <br />8 Countertop Color Change at request of Everett Transit 371.84 COP #12 <br />9 Reroute Sewer Connection due to unforseen circumstances in design 1,661.68 COP #13 <br />10 Repaint Breakroom Due to Color Change at request of Everett Transit 876.30 COP #14 <br />11 Building Signage Revisions at request of Everett Transit 2,622.01 COP #15 <br />12 Upgrade Bathroom Flush Valves at request of Everett Transit 928.55 COP #16 <br />14 Landscaping & Sidewalk Modifications to Accommodate Transformer 591.36 COP #18 <br />Line <br />No.Colocurcio Brothers, Inc. Change Proposals Amount Change Order <br />15 Unforseen Need for Locking Manhole Cover within the Pedestrian Area 752.37 COP # 7 <br />16 Unforseen Weather Resistive Barrier Installation Change that was not included in scope 1,697.02 COP #10 <br />17 Generator Rental Not Included in original scope of work due to unforseen circumstances 9,629.69 COP #11 <br />Total 150,208.14$ <br />Sales Tax N/A Rule 171 <br />Total plus WSST 150,208.14$
The URL can be used to link to this page
Your browser does not support the video tag.