Laserfiche WebLink
Exhibit A Date:3/6/2026 <br />Change Order No. 1 - Everett Mall Bus Platform Project - MALLSTN-24462 <br />Line <br />No.Construction Change Directives Amount Change Order <br />1 Northern Curb Modifications not included in original scope 72,839.15$ COP #1 <br />2 Brasco Shelter Logo Additions at request of Everett Transit not included in scope 3,938.55 COP #2 <br />3 Unforseen Electrical Modification for Change in Vault Size 20,427.27$ COP #3/4 <br />4 Electrical Modifications to Install Safety Monitors in Bathrooms at request of Everett Transit 2,283.31 COP #5 <br />5 Priming and Painting Ceilings at request of Everett Transit 795.00 COP #6 <br />6 Furnish and Install Access Management Controls at request of Everett Transit 25,822.27 COP #8 <br />7 Expansion Joint Color Change at request of Everett Transit 4,971.77 COP #9 <br />8 Countertop Color Change at request of Everett Transit 371.84 COP #12 <br />9 Reroute Sewer Connection due to unforseen circumstances in design 1,661.68 COP #13 <br />10 Repaint Breakroom Due to Color Change at request of Everett Transit 876.30 COP #14 <br />11 Building Signage Revisions at request of Everett Transit 2,622.01 COP #15 <br />12 Upgrade Bathroom Flush Valves at request of Everett Transit 928.55 COP #16 <br />14 Landscaping & Sidewalk Modifications to Accommodate Transformer 591.36 COP #18 <br />Line <br />No.Colocurcio Brothers, Inc. Change Proposals Amount Change Order <br />15 Unforseen Need for Locking Manhole Cover within the Pedestrian Area 752.37 COP # 7 <br />16 Unforseen Weather Resistive Barrier Installation Change that was not included in scope 1,697.02 COP #10 <br />17 Generator Rental Not Included in original scope of work due to unforseen circumstances 9,629.69 COP #11 <br />Total 150,208.14$ <br />Sales Tax N/A Rule 171 <br />Total plus WSST 150,208.14$