My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fire Protection Inc. 3/19/2026
>
Contracts
>
Agreement
>
Other Procurement Agreements
>
Fire Protection Inc. 3/19/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2026 1:35:38 PM
Creation date
3/19/2026 1:35:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Fire Protection Inc.
Approval Date
3/19/2026
Department
Finance
Department Project Manager
Bert Cueva
Subject / Project Title
Everett Animal Shelter Sprinkler System Repairs
Tracking Number
0005162
Total Compensation
$112,724.43
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />2 <br /> <br />Project <br />The Contractor will furnish all labor, tools, materials, equipment, <br />and supplies required to complete all work as set forth in the <br />Contract Documents. The entire work set forth in the Contract <br />Documents is referred to herein as either the “Work” or the <br />“Project.” <br />A brief (and not necessarily complete) description of the Project <br />follows: <br />Complete repairs to the sprinkler system throughout the Everett <br />Animal Shelter. Work includes repairing the bulk main water lines <br />to meet applicable fire codes. <br />Contract Time <br />The Project shall be physically complete in all respects within <br />ninety (90) calendar days from the date of issuance of a Notice to <br />Proceed. The Contractor shall not start the Work until receipt of <br />Notice to Proceed from the City. If a purchase order is issued for <br />the Work, it is only a Notice to Proceed. The purchase order’s pre- <br />printed terms and conditions are not part of the Contract. <br />Contract Price <br />The amount of this Contract is the Contract Price, which is <br />$112,724.43. The basis for final payment will be the actual amount <br />of Work performed in accordance with the Contract Documents. In <br />no event shall the total amount paid to Contractor exceed the <br />Contract Price unless the Contract amount has been increased by <br />one or more change orders signed by the City. <br />Contractor <br />Insurance <br />Contact <br />Information <br />Mallory Visser <br />360-603-9465 <br />Mallory.Visser@trucordia.com <br />Willful Wage <br />Violation <br />Certification <br />By signing this Agreement, the Contractor certifies that, within the <br />five-year period immediately preceding the date of Contractor’s <br />signature, the Contractor has not been determined by a final and <br />binding citation and notice of assessment issued by the <br />Washington Department of Labor and Industries or through a civil <br />judgment entered by a court of limited or general jurisdiction to <br />have willfully violated, as defined in RCW 49.48.082, any provision <br />of chapter 49.46, 49.48, or 49.52 RCW. This certification covers any <br />entity, however organized, that is substantially identical to <br />Contractor. An untrue certification by Contractor is a material <br />breach and cause for Contract termination.
The URL can be used to link to this page
Your browser does not support the video tag.