My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1433 49TH ST SW 2026-03-24
>
Address Records
>
49TH ST SW
>
1433
>
1433 49TH ST SW 2026-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2026 10:53:22 AM
Creation date
3/24/2026 10:00:22 AM
Metadata
Fields
Template:
Address Document
Street Name
49TH ST SW
Street Number
1433
Permit
C0706-058
Notes
LIFESTYLE HOMES BASIC 249
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. ` Connect side sewer per City Standard #601. <br />0 Connect side sewer per City Standard #'s 601, 602, 604. <br />6. Connect all rooftop downspouts to the side sewer. <br />Connect rooftop downspouts to the drainage system provided for this lot. <br />8. Rooftop runoff must be discharged to a roof downspout infiltration.system per City of Everett Storm <br />Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br />more details. <br />9. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br />beginning the project. <br />10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br />bales, swales, or erosion blankets. <br />11 Install erosion control measures per City of Everett Standards for small parcels <br />12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />13. All, excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br />permitted site. No wasting of material is allowed on this building lot. <br />14 No dirt, mud, rocks or debris to be tracked onto roadway. <br />5. No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br />pedestrian travel. <br />16. Adjust water meter box 1" above sidewalk grade. <br />17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard' Plan #'s 305A & 306 on <br />this proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />18. Install a Type I concrete driveway per City of Everett Standard #307. <br />G <br />Pave driveway from the front property line out to the street paving. <br />20. Contact the Water District for connecting provisions for this building's water and <br />sewer services. <br />21. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area. <br />22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br />gravity flow across the public right-of-way. <br />23. A sprinkler system is required for this building in compliance with'the requirements of NFDA Standards <br />13D. <br />FOR PUBLIC WORKS INSPECTION, CALL RANDY AT 425-339-7403 / CLIFF AT 425-339-7404 <br />PwComments <br />
The URL can be used to link to this page
Your browser does not support the video tag.