Laserfiche WebLink
RESIDENTIAL PHOTOVOLTAIC Permit Number: PV2507-004 <br /> PERMIT Permit Type: RESIDENTIAL PHOTOVOLTAIC <br /> Permit Subtype: <br /> EVERETT City of EverettPermit Services Date Issued: 8/22/2025 <br /> PermitServices@everettwa.gov 425.257.8810 Request Inspections:OnIine Perm its.everettwa.gov <br /> WASHINGTON <br /> PERMIT INFORMATION: <br /> SITE ADDRESS: 4404 29TH AVE SE PARCEL#: 01161300003100 <br /> DESCRIPTION: PV solar pitch roof mounted system TENANT: <br /> NOTES: PERMIT VALUATION: $21,892.98 <br /> Installing PV on roof, 5.16kW DC 4.148 kW ac <br /> CONTACT INFORMATION: <br /> OWNER:SANTOS RAD D&GRACE C PHONE: <br /> MAILING ADDRESS:4404 29TH AVE SE EVERETT,WA 98203 EMAIL: <br /> APPLICANT:SOLGEN POWER(ELEC)LLC PHONE: (206)649-9976 <br /> MAILING ADDRESS:S715 BEDFORD ST PASCO,WA 99301 EMAIL: picseattle@purelightpower.com <br /> CONTRACTOR: PURELIGHT POWER NEWCO LLC(CONST) PHONE: (541)816-4047 <br /> MAILING ADDRESS:3521 AVION DR STE 200 MEDFORD,OR 97504 EMAIL: picseattle@purelightpower.com <br /> STATE CONTRACTOR'S LIC#: SOLGEPL830RJ EVERETT BUSINESS LIC#: 62231 <br /> ELECTRICAL CONTRACTOR: PURELIGHT POWER NEWCO LLC(CONST) PHONE: (541)816-4047 <br /> MAILING ADDRESS:3521 AVION DR STE 200 MEDFORD,OR 97504 EMAIL: picseattle@purelightpower.com <br /> ELECTRICAL CONTRACTOR'S LIC#: GENERAL CONTRACTOR'S LIC#:SOLGEPL830RJ EVERETT BUSINESS LIC#: 62231 <br /> PURELPN765RG <br /> PERMIT FEES: <br /> DESCRIPTION PAID AMOUNT DATE PAID <br /> STATE SURCHARGE IRC $6.50 8/21/2025 <br /> Percent Credit Card Fee $14.43 8/21/2025 <br /> 12 CIRCUITS ALTER/ADD 1-2 $75.00 8/21/2025 <br /> BUILDING PERMIT CONSTRUCTION FEE $546.10 8/21/2025 <br /> $642.03 <br /> PERMIT CONDITIONS: <br /> CONDITION TYPE CONDITION DETAILS <br /> APPROVED PLANS TO REMAIN ON SITE Approved plans must remain on job site at all times.All work shall be constructed per the plans approved by the City of <br /> Everett Permit Services. <br /> MANUFACTURER SPECIFICATIONS ON-SITE Manufacturer Specification's must remain on job-site at all times and be available for Inspectors. <br /> INSPECTION SCHEDULING Inspections are required for all stages of construction and shall be scheduled online.Visit the City's online Permitting Portal at <br /> https://onlinepermits.everettwa.gov to formally request all required inspections.Available inspection dates are shown in the <br /> dropdown menu. <br /> SUBJECT TO FIELD INSPECTION All work shall be subject to field inspection. <br /> ELECTRICAL FINAL INSPECTION REQUIRED Electrical Final Inspection Required <br /> BUILDING FINAL INSPECTION REQUIRED Building Final Inspection Required. <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all claims for <br /> damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other right-of-way use here to <br /> applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br /> EVERETT Permit Number: PV2507-004 Page 1 of 2 <br />