Laserfiche WebLink
0 Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2502-073 Description: INTERIOR RENOVATION (TI)-PHASE II <br /> Applied: 2/28/2025 Approved:4/23/2025 Site Address: 1715 100TH PL SE <br /> Issued:4/24/2025 Finaled:9/9/2025 City,State Zip Code: EVERETT,WA 98208-3854 <br /> Status: FINALED Applicant: Rene Atkinson <br /> Parent Permit: B2501-018 Owner: BOY SCOUTS OF AMER-MT BAKER COUNCIL <br /> Parent Project: Contractor: CONSTANTINE BUILDERS INC <br /> Details: <br /> THIS PROJECT INVOLVES THE REVISION OF A CONDITIONED SPACE(Level 2 at 4,670 SF)TO HOUSE THE FUNCTIONS OF THE BUSINESS <br /> PORTION OF THE FOOD DISTRIBUTION ORGANIZATION. MANY OF THE EXISTING OFFICES ARE TO REMAIN.THE PROJECT WILL <br /> INVOLVE THE LIMITED MODIFICATION OF SOME OF THE EXISTING OPEN OFFICE SPACE,KITCHEN AND SMALL CONFERENCE ROOMS TO <br /> BETTER UTILIZE THE SPACE FOR THE NEW STAFF.AN ENTRANCE LOBBY HAS BEEN REVISED TO PROVIDE A GREETING AREA AND <br /> SECURITY FOR THE OFFICE.ADDITIONAL OFFICES(219 SF) HAVE BEEN PROVIDED AT THE LOWER LEVEL. EXTERIOR RENOVATIONS: <br /> SOME EXISTING STOREFRONT DOORS ARE TO BE REPLACE BY GLAZING TO PROVIDE A MORE SECURE BUILDING.THE GLAZING IS TO <br /> MEET OR EXCEED CODE REQUIREMENTS ADDITIONAL WORK FOR THE BUILDING HAS BEEN PROVIDED AND APPLIED FOR UNDER A <br /> PREVIOUS PERMIT: B2501-018. <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 6/11/2025 6/11/2025 BLDG 08-FRAMING RAKEEB KHAN APPROVAL See notes <br /> Notes: <br /> Ok to drywall mud and tape. <br /> 8/6/2025 8/7/2025 BLDG 16-FINAL Matt Schreifels CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 8/1/2025 3:55 PM Brian Miller <br /> Contact Name: Brian Miller <br /> Site Address:1715 100TH PL SE <br /> Phone:2063998995 <br /> e-Mail: brianm@constantinebuilders.com <br /> 1)Address corrections and receive final approval on all Sub permits prior to building final inspection. <br /> 2)Schedule inspection"Building final for fire"under the building permit for fire inspection and receive approval prior to building final. <br /> 3)Address Accessible restroom clear floor approach at sink on lower floor <br /> 4)Address Accessible drinking fountain clear floor approach on lower floor <br /> 5)revise/add exit signage on main floor and lower floor as discussed on site <br /> 8/7/2025 8/7/2025 FIRE 03-BLDG FINAL GORDON APPROVAL <br /> FOR FIRE MOSTELLER <br /> Notes: <br /> 8/18/2025 8/18/2025 BLDG 16-FINAL Matt Schreifels CORRECTION AFTERNOON IF POSSIBLE <br /> REQUIRED <br /> Notes: <br /> 206-399-8995 <br /> I_ <br /> Printed: Monday, 22 September, 2025 1 of 2 <br /> SUPERION <br />