My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4918 23RD AVE W 2026-05-06
>
Address Records
>
23RD AVE W
>
4918
>
4918 23RD AVE W 2026-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 8:31:47 AM
Creation date
4/2/2026 7:41:02 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD AVE W
Street Number
4918
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2503-073 Description: Rebuilding existing decks making one slightly larger <br /> Applied:3/26/2025 Approved: 6/17/2025 Site Address:4918 23RD AVE W <br /> Issued:6/17/2025 Finaled: City,State Zip Code: EVERETT,WA 98203-1529 <br /> Status: PERMIT ISSUED-ONLINE Applicant: MOHAMMAD ASAKREH <br /> Parent Permit: Owner:VIJGEN PAUL&ALISON <br /> Parent Project: Contractor: 3 BROTHERS DECKING LLC <br /> Details: <br /> *10/9/25 REVISION AFTER ISSUED APPROVED: FOUNDATION DESIGN REVISED TO(3)2-INCH PIPE PILES PER FOOTING* <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 6/4/2025 6/4/2025 PLNG-COVENANT Teddi Holbrook APPROVAL Geological Covenant Required <br /> Notes: <br /> Recorded under AFN 202506020351 <br /> 10/24/2025 10/24/2025 BLDG 02- Darold Phinney NOT READY see notes <br /> FOOTING/SETBACK <br /> Notes: <br /> 10/23/2025 4:55 PM 3 BROTHERS DECKING LLC <br /> Please call Felipe at 425-499-2479 upon arrival,Thank you <br /> Contact Name:3 BROTHERS DECKING LLC <br /> Site Address:4918 23RD AVE W <br /> Phone:2067754897 <br /> e-Mail:mohammad.a@3brothersdecking.com <br /> I met with the contractor on site today.They were having difficulty with driving the required 2"piles into the hard ground for the footings.I told them <br /> to report the information to the engineer who designed the project,ask if they have any other recommendations for the footings.Submit any permit <br /> changes from the approved,or call for re inspection if the method of piles driven into the ground is followed. <br /> 10/30/2025 10/30/2025 BLDG 02 Darold Phi nney CORRECTION see notes <br /> FOOTING/SETBACK REQUIRED <br /> Notes: <br /> 10/28/2025 5:43 PM 3 BROTHERS DECKING LLC <br /> AM inspection if possible.please call felipe at 425-499-2479 prior to arrival.thank you. <br /> Contact Name:3 BROTHERS DECKING LLC <br /> Site Address:4918 23RD AVE W <br /> Phone:2067754897 <br /> e-Mail:mohammad.a@3brothersdecking.com <br /> Steel pipe piles require attached cap per detail 2 on plan.Missing 4 pads that are required for stairs from lower deck. Rebar mats that are in footings <br /> need to be in place for approval.All footing depths need to be a minimum of 18"deep for city of Everett municipal code 301.2Call for re inspection <br /> before pouring concrete. <br /> I <br /> Printed: Monday, 24 November, 2025 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.