Laserfiche WebLink
Task 3 – Video Collection and Data Processing <br />-4:30 AM–7:00PM <br /> <br />-6:00AM–6:00 PM <br /> <br />pedestrian, bicycle, vehicular, and heavy-vehicular <br />movements Federal Highway Administration (FHWA) 13-Bin Vehicle <br /> <br />o Bin 1: <br />o Bins 2–3 (without trailers): <br />o Bins 2–3 (with trailers): <br />o Bins 4–13: <br />divided into alternating time segments (e.g., even <br />and odd hours) <br />no single analyst is responsible for an entire dataset, <br />- <br />o ––– <br />––– <br />o <br />-