My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Greely St. Water Quality Retrofit Division P – PROPOSAL January 2026 <br />Work Order No. UP3817 SP – 14 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit price and <br />the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. All entries must be <br />typed or entered in ink. <br />BID SCHEDULE <br /> BIDDER:___________________________ <br /> <br />Item <br />No. ITEM DESCRIPTION Unit Bid <br />Qty UNIT PRICE TOTAL AMOUNT <br />1 Mobilization LS 1 $_______.___ $______________.___ <br />2 Surveying LS 1 $_______.___ $______________.___ <br />3 Record Drawings LS 1 $_______.___ $______________.___ <br />4 SPCC Plan LS 1 $_______.___ $______________.___ <br />5 Force Account/Unexpected Conditions FA 1 $ 40,000.00 $ 40,000.00 <br />6 Traffic Control Labor HR 40 $_______.___ $______________.___ <br />7 Maintenance & Protection of Traffic Control LS 1 $_______.___ $______________.___ <br />8 Street Cleaning & Sweeping HR 20 $_______.___ $______________.___ <br />9 Trench Excavation Safety Systems LS 1 $_______.___ $______________.___ <br />10 Erosion/Water Pollution Control LS 1 $_______.___ $______________.___ <br />11 Saw Cutting Existing Improvements LF 230 $_______.___ $______________.___ <br />12 Removal of Structures and Obstructions LS 1 $_______.___ $______________.___ <br />13 Crushed Surfacing Base Course TON 162 $_______.___ $______________.___ <br />14 Gravel Borrow TON 176 $_______.___ $______________.___ <br />15 Schedule A Storm Sewer Pipe, 12 In. Dia. LF 179 $_______.___ $______________.___ <br />16 Schedule A Storm Sewer Pipe, 18 In. Dia. LF 38 $_______.___ $______________.___ <br />17 Ductile Iron Storm Sewer Pipe, 12 In. Dia. LF 13 $_______.___ $______________.___ <br />18 Catch Basin, Type 1 EA 3 $_______.___ $______________.___ <br />
The URL can be used to link to this page
Your browser does not support the video tag.