My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Greely St. Water Quality Retrofit Division P – PROPOSAL January 2026 <br />Work Order No. UP3817 SP – 19 <br /> <br />Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br />and License Number <br />HEATING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />VENTILATION AND AIR CONDITIONING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />PLUMBING (as described in RCW Chap. 18.106) <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />ELECTRICAL (as described in RCW Chap. <br />19.28) <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />Errors identified by the City in the proof of license information must be corrected by the Bidder <br />within 48 hours of submission. <br /> <br />Type/Scope of Work Name and Address of Subcontractor or Bidder <br />STRUCTURAL STEEL INSTALLATION <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />REBAR INSTALLATION <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.