Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 58 <br />1-04 SCOPE OF THE WORK <br />1-04.1 Intent of the Contract <br />Supplement 1-04.1 by adding the following: <br />1-04.1(3) Specifications and Plans <br />(******) <br />1-04.1(3)A Interpretation of Specifications and Plans <br />The Specifications and Plans are intended to be explanatory and supportive of each <br />other. Work specified on the Plans and not in the Specifications, or vice versa, shall <br />be executed as if specified in both. In the event the Work to be done or matters <br />relative thereto are not sufficiently detailed or explained in the Contract Documents, <br />the Contractor shall immediately ask the City’s Representative for further <br />explanation and shall comply with such explanation. In the event of doubt or <br />question arising respecting the true meaning of the Specifications or Plans, <br />Contractor shall refer to the City’s Representative for its decision. <br />1-04.1(3)B Division of Specifications and Plans <br />Specifications and Plans are divided into groups for convenience. These divisions <br />are not for the purpose of apportioning Work or responsibility for Work among <br />Subcontractors, Suppliers and manufacturers. The Contractor is responsible for all <br />Work shown or described, regardless of location(s) in the Contract Documents. <br />1-04.1(3)C Discrepancies in Specifications and Plans <br />1-04.1(3)C(1) Errors and Omissions <br />If the Contractor becomes aware of any errors or omissions in the Contract <br />Documents or in the City's field work, it shall immediately inform the City’s <br />Representative in writing. The City’s Representative will promptly review the <br />matter and if it finds an error or omission has been made; it will determine the <br />corrective actions and advise the Contractor accordingly. If the corrective work <br />associated with an error or omission increases or decreases the amount of <br />Work called for in the Contract, the City will issue an appropriate Change Order. <br />After discovery by the Contractor of an error or omission, related Work <br />performed by the Contractor shall be done at its risk unless authorized by the <br />City’s Representative and approved by the City. <br />1-04.1(3)C(2) Conflicting Provisions <br />In the event an item of Work is described differently in two or more locations on <br />the Plans, in the Specifications and Special Provisions, the Contractor shall, <br />upon request of the City’s Representative, submit in writing to the City’s <br />Representative the description upon which the Contractor relied in preparing <br />its Bid or laying out the Work. <br />1-04.1(3)D Utilities <br />1-04.1(3)D(1) General <br />The City has endeavored to determine the existence of public and private <br />utilities at the site of the Work from the records of the owners of known utilities <br />in the vicinity of the Work. The positions of these utilities as derived from such <br />records are shown on the Plans. Unless otherwise noted, no excavations were <br />made to verify the locations shown for underground utilities. The service <br />connections to the gas, electric, cable TV and communication utilities are not <br />shown on the Plans. Refer to 1-07.17 UTILITIES AND SIMILAR FACILITIES <br />regarding Contractor’s responsibility for locating and verifying underground <br />public and private utilities.