My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 67 <br />Engineer’s written approval before proceeding with the Work represented by the <br />Working Drawing. <br />5. Type 3E – Same as a Type 3 Working Drawing with Engineering as described below. <br />Supplement 1-05.3 as follows: <br />The Contract Documents include Plans that show such details as are reasonably <br />necessary to give a comprehensive understanding of the Work. The Contractor shall <br />submit alterations affecting the requirements and information in the Plans in writing to <br />the Engineer for approval prior to performing such Work. <br />The Engineer may supplement the Plans with additional drawings and explanations, <br />consistent with the purpose and intent of the original Plans, to detail and illustrate the <br />Work. The Contractor shall perform the Work according to these supplemental drawings <br />and explanations. <br />In addition to supplemental drawings furnished by the Engineer, the Contract Documents <br />may also be supplemented by Type 1, Type 2 or 2E, and Type 3 or 3E Working Drawings <br />prepared by the Contractor, material supplier, or manufacturer, when necessary or as <br />required by the Contract Documents to detail and illustrate portions of the Work. All <br />types of Working Drawings shall be reviewed by the Engineer before work pursuant to <br />those Working Drawings is performed. Type 3 and 3E Working Drawings may include, <br />and not be limited to, shop details, erection plans, masonry lay-out diagrams, reinforcing <br />steel and bending diagrams, post tensioning plans, shoring, cribbing, cofferdam, or <br />falsework plans, formwork plans, or hydraulic items. Type 2 and 2E Working Drawings <br />may include, and not be limited to, Catalog cuts or standard plans for commonly used <br />manufactured items. <br />The Contractor shall be fully responsible for the accuracy of dimensions and details on <br />Working Drawings, and for complete conformity with the Contract Documents, even if <br />the Working Drawings have been approved by the Engineer, or if the Contractor and the <br />Engineer agree on dimensions and details. The City does not accept Working Drawings <br />as accurate or adequate, and does not take responsibility for, or warrant that Working <br />Drawings will meet Contract requirements. <br />Engineer's review of Working Drawings shall not relieve Contractor from responsibility <br />for variation from the requirements of the Contract Documents unless Contractor has in <br />writing called the Engineer's attention to each such variation at the time of submission, <br />and the Engineer has given written approval of each such variation by a specific written <br />notation thereof incorporated in or accompanying the returned Working Drawing; nor will <br />review by Engineer relieve Contractor from responsibility for errors or omissions in the <br />Working Drawings or from responsibility for having complied with the provisions of this <br />section. <br />The Bid prices shall include all costs for furnishing Working Drawings and Submittals. <br />The following listed sections of the Standard Specifications and Special Provisions <br />require Working Drawings that may or may not be applicable to this specific project. This <br />list is supplied as an aid to the Contractor and is by no means complete. Submittal <br />requirements may be found in 1-05.3(1) or elsewhere in these Special Provisions. <br />DIVISION 2 EARTHWORK <br />2-09.3(3)D Shoring, Cribbing, and Cofferdams-Shop Drawings <br />DIVISION 6 STRUCTURES <br />6-01 General Requirements <br />6-01.9 Working Drawings <br />6-02 Concrete Structures
The URL can be used to link to this page
Your browser does not support the video tag.