My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 81 <br />1-06.1 Approval of Materials Prior to Use <br />Revise the first paragraph of 1-06.1 to read as follows: <br />Prior to use, Contractor shall notify the Engineer of all proposed materials. Contractor <br />may use the Qualified Product List (QPL) and the Aggregate Source Approval (ASA) <br />Database. Contractor shall use the Request for Approval of Material (RAM) form. <br />Supplement 1-06.1 by adding the following: <br />Contractor shall provide product data, when specified, in accordance with 1-05.3(1) <br />SUBMITTALS of these Special Provisions for inspecting, testing, operating, or <br />maintaining Equipment and materials supplied as part of the Work. Unless otherwise <br />specified, such data shall be provided at the time the referenced material or Equipment <br />is delivered to the job site. Contractor shall provide data as specified and include, unless <br />otherwise specified, but not be limited to shop drawings, erection drawings, reinforcing <br />steel schedules, testing and adjusting instructions, operations manuals, maintenance <br />procedures, parts lists, and record drawings. Contractor shall provide data as part of <br />the Work under this Contract and its acceptability will be determined by the City in its <br />sole discretion. <br />Further supplement 1-06.1 by adding the following: <br />1-06.1(5) Requests for Substitution <br />(******) <br />The City will not usually consider a substitution for material or Equipment specified by <br />brand name or manufacturer or sole-sourced. <br />Only the Contractor may offer materials or Equipment of equal or better quality and <br />performance as a substitution for those specified. The Contractor shall make <br />substitution offers in writing to the City’s Representative in accordance with 1-05.3(1) <br />SUBMITTALS of these Special Provisions. The substitution offer must include sufficient <br />data to enable the City’s Representative to assess the acceptability of the material or <br />Equipment for the particular application and requirements. The City and City’s <br />Representative are not required or obligated to consider or review a request for <br />substitution and may, in their sole discretion and option, consider or review such <br />requests. <br />If the offered substitution requires changes to or coordination with other portions of the <br />Work, include, if any, drawings, and details showing such changes. The Contractor <br />agrees to perform these changes as part of the substitution of material or Equipment at <br />no additional cost to the City. Approval of a substitution request will not relieve the <br />Contractor from responsibility for the efficiency, quality, and performance of the <br />substitute material or Equipment, in the same manner and degree as the materia l and <br />Equipment originally specified. Reflect cost differential associated with a substitution in <br />the offer. If the City approves the substitution, the Contract Documents will be modified <br />by a Change Order modifying the Contract Sum in the amount of the cost differential. <br />1-06.2 Acceptance of Materials <br />1-06.2(2)B Financial Incentive <br />Delete 1-06.2(2)B. <br />1-06.2(2)D Quality Level Analysis <br />Delete 1-06.2(2)D. <br />1-06.3 Manufacturer’s Certificate of Compliance <br />Supplement 1-06.3 by adding the following:
The URL can be used to link to this page
Your browser does not support the video tag.