My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 84 <br />In cases of conflict between different safety regulations, the more stringent regulation <br />shall apply. <br />The Washington State Department of Labor and Industries shall be the sole and <br />paramount administrative agency responsible for the administration of the provisions of <br />the Washington Industrial Safety and Health Act of 1973 (WISHA). <br />The Contractor shall maintain at the project site office, or other well-known place at the <br />project site, all articles necessary for providing first aid to the injured. The Contractor <br />shall establish, publish, and make known to all employees, procedures for ensuring <br />immediate removal to a hospital, or doctor’s care, persons, including employees, who <br />may have been injured on the project site. Employees should not be permitted to work <br />on the project site before the Contractor has established and made known procedures <br />for removal of injured persons to a hospital or a doctor’s care. <br />The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of <br />the Contractor’s plant, appliances, and methods, and for any damage or injury resulting <br />from their failure, or improper maintenance, use, or operation. The Contractor shall be <br />solely and completely responsible for the conditions of the project site, including safety <br />for all persons and property in the performance of the Work. This requirement shall <br />apply continuously, and not be limited to normal working hours. The required or implied <br />duty of the Engineer to conduct construction review of the Contractor’s performance <br />does not, and shall not, be intended to include review and adequacy of the Contractor’s <br />safety measures in, on, or near the project site. <br />1-07.1(7) Noise <br />Work within 500 feet of residential properties between the hours of 10:00 p.m. and 7:00 <br />a.m. during weekdays and between the hours of 6:00 p.m. and 8:00 a.m. on weekends <br />or holidays are subject to noise control requirements if the work generates decibel levels <br />of greater than 55 db(A). Contractor may apply for a Noise Variance a minimum of 30 <br />days prior to performing work and pay $100.00 application fee, using the following link <br />to obtain the latest information on noise variance requirements: <br />https://www.everettwa.gov/formcenter/human-resources-16/request-for-temporary- <br />construction-noise-167. The Contractor must not assume that a Noise Variance will be <br />granted. In no event will the Contractor be entitled to any adjustment of the Contract <br />Sum or Contract Time if a Noise Variance is denied. <br />Typical requirements include, and not limited to, broadband backup alarms on all <br />equipment requiring a backup alarm, anti-tail gate slamming devices, dump truck bed <br />liners, and sawcutting, vacuum excavation, pavement breaking and loading export haul <br />noise must be done between the hours of 7:00 a.m. and 10:00 p.m. during weekdays <br />and between 8:00 a.m. and 6:00 p.m. on weekends. <br />1-07.2 State Taxes <br />Delete 1-07.2 and substitute the following: <br />1-07.2 State Sales Tax <br />The Washington State Department of Revenue has issued special rules on the State <br />sales tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The <br />Contractor should contact the Washington State Department of Revenue for answers to <br />questions in this area. The City will not adjust its payment if the Contractor bases a Bid <br />on a misunderstood tax liability. <br />The Contractor shall include all Contractor-paid taxes in the unit bid prices or other <br />contract amounts. In some cases, however, state retail sales tax will not be included. <br />Section 1-07.2(3) describes this exception.
The URL can be used to link to this page
Your browser does not support the video tag.