CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 84 <br />In cases of conflict between different safety regulations, the more stringent regulation <br />shall apply. <br />The Washington State Department of Labor and Industries shall be the sole and <br />paramount administrative agency responsible for the administration of the provisions of <br />the Washington Industrial Safety and Health Act of 1973 (WISHA). <br />The Contractor shall maintain at the project site office, or other well-known place at the <br />project site, all articles necessary for providing first aid to the injured. The Contractor <br />shall establish, publish, and make known to all employees, procedures for ensuring <br />immediate removal to a hospital, or doctor’s care, persons, including employees, who <br />may have been injured on the project site. Employees should not be permitted to work <br />on the project site before the Contractor has established and made known procedures <br />for removal of injured persons to a hospital or a doctor’s care. <br />The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of <br />the Contractor’s plant, appliances, and methods, and for any damage or injury resulting <br />from their failure, or improper maintenance, use, or operation. The Contractor shall be <br />solely and completely responsible for the conditions of the project site, including safety <br />for all persons and property in the performance of the Work. This requirement shall <br />apply continuously, and not be limited to normal working hours. The required or implied <br />duty of the Engineer to conduct construction review of the Contractor’s performance <br />does not, and shall not, be intended to include review and adequacy of the Contractor’s <br />safety measures in, on, or near the project site. <br />1-07.1(7) Noise <br />Work within 500 feet of residential properties between the hours of 10:00 p.m. and 7:00 <br />a.m. during weekdays and between the hours of 6:00 p.m. and 8:00 a.m. on weekends <br />or holidays are subject to noise control requirements if the work generates decibel levels <br />of greater than 55 db(A). Contractor may apply for a Noise Variance a minimum of 30 <br />days prior to performing work and pay $100.00 application fee, using the following link <br />to obtain the latest information on noise variance requirements: <br />https://www.everettwa.gov/formcenter/human-resources-16/request-for-temporary- <br />construction-noise-167. The Contractor must not assume that a Noise Variance will be <br />granted. In no event will the Contractor be entitled to any adjustment of the Contract <br />Sum or Contract Time if a Noise Variance is denied. <br />Typical requirements include, and not limited to, broadband backup alarms on all <br />equipment requiring a backup alarm, anti-tail gate slamming devices, dump truck bed <br />liners, and sawcutting, vacuum excavation, pavement breaking and loading export haul <br />noise must be done between the hours of 7:00 a.m. and 10:00 p.m. during weekdays <br />and between 8:00 a.m. and 6:00 p.m. on weekends. <br />1-07.2 State Taxes <br />Delete 1-07.2 and substitute the following: <br />1-07.2 State Sales Tax <br />The Washington State Department of Revenue has issued special rules on the State <br />sales tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The <br />Contractor should contact the Washington State Department of Revenue for answers to <br />questions in this area. The City will not adjust its payment if the Contractor bases a Bid <br />on a misunderstood tax liability. <br />The Contractor shall include all Contractor-paid taxes in the unit bid prices or other <br />contract amounts. In some cases, however, state retail sales tax will not be included. <br />Section 1-07.2(3) describes this exception.