CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 91 <br />in damage to buried utilities, including but not limited to exploratory excavations, in <br />sufficient time so as not to impede the progress of the Work or fabrication of materials <br />to be incorporated into the Work. The Contractor shall immediately notify the City’s <br />Representative as to any utility discovered by him in a different position than shown on <br />the Plans or that is not shown on the Plans. <br />No excavation shall begin until all known underground public and private utilities in the <br />vicinity of the excavation area have been located and marked. <br />Utilities of record are shown on the Plans insofar as it is possible to do so. Failure of the <br />City to show the existence of subsurface objects or installation on the Plans shall not <br />relieve the Contractor from its responsibility to make an independent check on the <br />ground, nor relieve Contractor from all liability for damages resulting from its operations. <br />It shall be entirely the responsibility of the Contractor to give proper notification to the <br />agencies that have utilities in place and to coordinate with these agencies in the <br />protection and relocation of the various underground installations. These agencies will <br />give assistance in the location of the various utilities, but this shall not relieve the <br />Contractor from responsibility for any damage incurred. The City shall require a <br />notification of at least five working days. The Contractor shall hold the City harmless <br />against any claim of any nature resulting from Delays in attending to same. <br />Following are addresses and telephone numbers of utilities in the Everett area for the <br />Contractor's convenience as of December 15, 2022: <br />