Laserfiche WebLink
Exhibit A (Scope of Work) <br />•Health Department application prepared and submitted by Owner (if required) <br />•Coordinate with Planning and Building department for permit documents and <br />permit intake requirements <br />•Permit application <br />•Building department corrections as necessary <br />Part V <br />Bid Phase Assistance <br />•Assist with contractor RFl's, substitution request, etc. <br />•Assist with Pre-bid addenda preparation <br />Part VII <br />Structural Drawings <br />Structural Calculations. <br />Part VIII <br />Mechanical Drawings <br />•Added HVAC/refrigeration. <br />•Energy Code Calculations. <br />Part IX <br />Electrical Drawings <br />•New Lighting <br />•New Power Requirements. <br />•Energy Code Calculations. <br />•Backup power generator <br />Part X <br />Security Drawings <br />•1. Evidence Room Requirements