My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2514 RUCKER AVE 2018 Plans 2026-04-10
>
Address Records
>
RUCKER AVE
>
2514
>
Plans
>
2514 RUCKER AVE 2018 Plans 2026-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2026 9:10:18 AM
Creation date
4/10/2026 9:10:05 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2514
Permit
BW1803-006
Year
2018
Notes
CONVERT SFR INTO DUPLEX. REMOVE 3RD UNIT INSTALLED W/O PERMI
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLUMBING FIXTURE SChEDULE <br />PLIMBIA13FIATIRESCAED1 <br />��:Prnay:�li:T� r�rLE��r�•1m�•1ay�lillla��:(m�ria:i��� <br />411111111111111 <br />y 1L�F7WL1��0���� <br />ENERGY CODE SUMMARY <br />Prescriptive Energy Code Compliance for All Climate Zones In Washington <br />P jacf Information Contact Information <br />ALTERATION TO EXISTING SFR TO CONVERT GARIN SCHENK, ARCHITECT <br />BASEMENT TO NEW DWELLING UNIT PHONE: 206.931.0990 <br />GARIN@ARC HSTU D I O EVERETT.COM <br />This project will use the requirements of the Prescriptive Path below and incorporate the <br />the minimum values listed. In addition, based on the size of the structure, the appropriate <br />number of additional credits are checked as chosen by the permit applicant. <br />Authorized Representative Date <br />All Climate Zones <br />R-Value <br />- aclo <br />Fenestration T.-Facto <br />n/a <br />0.30 <br />Skylight U-Factor <br />n/a <br />0.50 <br />Glazed Fenestration SHGC <br />WE <br />n/a <br />Calling" <br />44 <br />0,026 <br />Wood Frame Wells'"n <br />21 Int <br />0.056 <br />Mass Wall R-Value <br />21/21 <br />0.056 <br />Floor <br />30 <br />0.029 <br />Below Grade WelP"' <br />10/15/21int+TB <br />0.042 <br />Slab R-V81u0 & Depth <br />10, 2It <br />WE <br />'able R402.1.1 and Table R402.1.3 Footnotes Included on Page 2. <br />Each dwelling unit In a residential building shall comply with sufficient options from Table R406.2 so as to achieve <br />the following minimum number of credits: <br />1. Small Dwelling Unit: 1.5 credits <br />❑' Dwelling units less than 1500 square feet In conditioned floor area with less than 300 square feet of fenestration <br />area. Additions to existing building that are greater then 600 square feet of heated floor area but less than 1500 <br />square feet. <br />❑2. Medium Dwelling Unit: 3.5 credits <br />All <br />dwelling units that are not Included in #1 or #3. Exception: Dwelling units serving R-2 occupancies shall <br />require 2.5 credits. <br />❑3. Large Dwelling Unit: 4.5 credits <br />Dwelling units exceeding 5000 square feet of conditioned floor area. <br />TE4. Addition, less than 500 anus.. feet- 5 eredit. <br />Table R406.2 Summary <br />Total Credits <br />*Please refer to Table R406.2 for complete option descriptions <br />I 1.5 <br />kwh 0.0 <br />1.50 <br />tape nguz.i.zf•ootnotes <br />For SI: 1 foot .= 304.8 mm, ci = continuous Insulation, int : intermediate framing. <br />' R-values are minimums. U-factors and SHGC are maximums. When insulation is installed In a cavity which is <br />less than the label or design thickness of the insulation, the compressed R-value of the insulation from <br />Appendix Table A101.4 shall not be less than the R-value specified in the table. <br />° The fenestration U-factor column excludes skylights. The SHGC column applies to all glazed fenestration. <br />"'10/15/21.+TB" means R-10 continuous insulation on the exterior of the wall, or R-15 on the continuous <br />Insulation on the Interior of the wall, or R-21 cavity Insulation plus a thermal break between the slab and the <br />basement wall at the interior of the basement wall. "10/15/21.+TB" shall be permitted to be met with R-13 <br />cavity Insulation on the Interior of the basement wall plus R-5 continuous Insulation on the interior or exterior <br />of the wall. "30/13" means R-10 continuous Insulation on the Interior or exterior of the home or R-13 cavity <br />Insulation at the interior of the basement wall. "TB" means thermal break between floor slab and basement <br />wall. <br />° R-10 continuous Insulation is required under heated slab on grade floors. See R402.2.9.1. <br />' There are no SHGC requirements in the Marine Zone. <br />Reserved. <br />r Reserved. <br />Reserved. <br />The second R-value applies when more than half the Insulation Is on the interior of the mass wall. <br />Reserved. <br />For single rafter -or joist -vaulted ceilings, the insulation may be reduced to R-38. <br />Reserved. <br />" Int. (intermediate framing) denotes standard framing 16 Inches on center with headers Insulated with a <br />minimum of R-10 insulation. <br />Table R402.1.3 Footnote <br />' Nonfenestration U-factors shall be obtained from measurement, calculation or an approved source or as <br />Specified in Section R402.1.3. <br />• [E] CAPZ OVER CARPET PAD <br />j UBFLOOR <br />;A1x8 T&G FLOOR SHEATHING <br />P" 2x8 FRAMING @ 16' O.C. <br />• [E] LATHE AND PLASTER ASSEMBLY <br />• [E] 2A FRAMING @ 16' O.C. <br />• 3? BATT INSULATION <br />k' TYPE'C' GWB <br />AEF CING STANDARD UL L569 <br />NOTE USED Q <br />3 <br />C1 <br />BASEMENT CEILING/MAIN FLOOR ASSEMBLY: <br />[E] t T&G WOOD FLOORING <br />• [E]1x8 T&G FLOOR SHEATHING (CROSS -LAID) <br />I^ <br />• [E] &B WOOD FRAMING @ 16' O.C. <br />4, BAIT INSULATION <br />..:.......... ..... ............................: <br />• RESILIENT CHANNEL @ 16' D.C. (CROSS -LAID) <br />"C° <br />1 • I' TYPE GWB <br />Q <br />REFERENCING STANDARD UL L569 <br />W1 <br />FURRED OUT WALL ASSEMBLY Cal CONCRETE: <br />e <br />• [EI CONCRETE FOUNDATION WALL <br />1' RIGID POLY4SO INSULATION (R-5) <br />" <br />• 20 WOOD FRAMING 1 V O.C. <br />MINERAL WOOL INSULATION (R-1 3) <br />4 <br />TYPE "X' PAINTED GWB <br />a <br />is <br />` <br />JUN 11 201 <br />CITY OF EVERETT <br />Permit Services <br />W2 <br />•,' };tj <br />ai <br />EXTERIOR INSULATION @ CONCRETE: <br />r !,-, •� <br />• �' EXTERIOR COVER BOARD -TO EXTEND 6' <br />" 4.. •, <br />BELOW GRADE <br />• 4' RIGID POLY40 INSULATION (R-21) -TO <br />EXTEND TO TOP OF FOOTING <br />"-,_j. <br />• LIQUID -APPLIED DAMPPROOFING <br />c <br />• [E] CONCRETE FOUNDATION WALL <br />IL <br />l� <br />NT WALL ASSEMBLY ABOVE CONCRETE: <br />NED EJOERIOR CLADDING <br />AVFATHEA BAAIIIER <br />FLAMEBLOCK PLUS(FIRE-CAULKED JOINTS)ST. <br />2x6 WOOD FRAMING @ 16' O.C.ERGLASS <br />INSULATION (R-21) <br />POR BARRIER <br />:REFEREPNCING <br />YPE'9 PAINTED GWB <br />I-HOUflINT/D(T ASSEMBLYUL-V311.CITY <br />OF EVERETTEVIEWED <br />FOR PERMI <br />('AA <br />��fBE i i • ��� <br />F— <br />W <br />00 <br />O <br />a <br />O <br />3 e <br />y <br />v� <br />tx s <br />W <br />W ff� <br />O <br />• z <br />oe <br />z m <br />y <br />a <br />W <br />� o <br />m <br />_ <br />o <br />tLl <br />� <br />o e <br />Q <br />w N <br />10... <br />NREGIS7TERED��..•• <br />0441•` <br />GARIN A. CHENE <br />STATE OF NASHINGTON <br />2019.06.10 <br />T <br />N <br />00 <br />M <br />Q <br />I-- <br />LU <br />W <br />W <br />LU <br />W <br />J z <br />LU <br />�Q <br />LU <br />C <br />U <br />z <br />C <br />N <br />DRAWNGS <br />DATE: <br />2018.03.13 <br />PROJECT#: <br />2018.01 <br />SCALE; PER DRAWING <br />PHASE: <br />BUILDING PERMIT SUBMISSION <br />MARCH 19, 2018 <br />REVISIONS: <br />QPERMIT SET REVISIONS <br />t 2018.07.D2 <br />PERMIT SET REVISION <br />2 2019.04.18 <br />PERMIT SET REVISIONS <br />3 2019.05.10 <br />PERMIT SET VISION S <br />4 2019.06.1RE <br />0 <br />TITLE'. <br />ASSEMBLIES AND <br />ENERGY CODE <br />SHEEN. <br />A0.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.