My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST SPRINKLER HEADS 2025 PARKS STUDENT UNION Plans 2026-04-10
>
Address Records
>
TOWER ST
>
2000
>
PARKS STUDENT UNION
>
Plans
>
2000 TOWER ST SPRINKLER HEADS 2025 PARKS STUDENT UNION Plans 2026-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2026 11:33:50 AM
Creation date
4/10/2026 11:33:45 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Unit
SPRINKLER HEADS
Tenant Name
PARKS STUDENT UNION
Permit
K2504-004
Year
2025
Notes
RELOCATE (5) SPRINGKLER HEADS, ADD (6) NEW SPRINKLER HEADS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 CITY OF EVERETT PERMIT SERVICES <br /> EVERETT PERMIT APPROVAL & NOTES COVER SHEET <br /> WASHINGTON <br /> STANDARD CONDITIONS OF APPROVAL: REVIEWER APPROVALS: PERMIT <br /> INFORMATION: <br /> 1. Approved plans must be on job site at all times and available for inspectors. PUBLIC WORKS: Site Address: <br /> 2. See face of permit for permit conditions of approval and additional requirements. ET EVEFT I City of Everett Permit Services 2000 TOWER ST <br /> REVIEWED FOR CODE COMPLIANCE <br /> By Review Discipline:Public Works <br /> 3. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at Reviewer:THerman <br /> Date:04/17/2025 Owner <br /> onllnepermlts.everettwa.govto formally request all required Inspections. Review Status:Approved for Permit <br /> EVERETT COMMUNITY <br /> 4. This permit must be finaled in order to close out this permit, legitimize work and grant a Certificate of Occupancy. COLLEGE <br /> 5. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER Tenant: <br /> 811. FIRE: EVCC - PARKS STUDENT <br /> 6. All work shall be performed in accordance with the approved permit conditions and plans approved by the City of UNION BLDG <br /> Everett. <br /> EVERETT <br /> Everett Fire Dept.Permit Review <br /> Status:Approved App. Date <br /> 7. Protect all existing underground utilities during construction. Reviewed By:kbrown <br /> 04/14/2025 8:13:29 <br /> AM 4/11/2025 <br /> 8. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as <br /> directed by the City PW Inspector. <br /> Permit Type: <br /> 9. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadway. FIRE SUPPRESSION <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious <br /> surfaces will be managed on-site in a manner that does not adversely affect neighboring properties, including the Subtype: <br /> City's right-of-way and/or easements and the improvements located therein. FIRE SPRINKLER WATER <br /> BASED SYSTEM <br /> Description: <br /> RELOCATE (5) <br /> SPRINGKLER HEADS, <br /> ADD (6) NEW SPRINKLER <br /> HEADS <br /> PERMIT NUMBER: <br /> K2504-004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.