Laserfiche WebLink
GENERAL NOTES: GENERAL NOTES: CONT'D GENERAL NOTES: CONT'D GENERAL NOTES: CONT'D LEGEND: <br />1. BASEMAP FOR COLLEGE STATION SITE COMPILED FROM CAD 5. CONTRACTOR TO COORDINATE CONSTRUCTION ACTIVITY, 10. CONTRACTOR SHALL PROVIDE LIFTING EQUIPMENT CAPABLE 14. CONTRACTOR SHALL PROVIDE PULLING TAPE WITH SAWCUT <br />FILES AND AS -BUILT PDFs OBTAINED FROM EVERETT STAGING, AND SEQUENCING WITH ET SERVICE OPERATIONS A OF LIFTING AND INSTALLING THE GA CABINET AND A/C UNIT SEQUENTIAL FOOTAGE MARKINGS AND ATTACHED TO AN END E MOMENTUM DYNAMICS EV CONDUIT <br />TRANSIT. DRAWINGS RECEIVED ON SEPTEMBER 29, 2022. MINIMUM OF 4 WEEKS IN ADVANCE OF NTP. TRANSIT ATTACHED TO GA CABINET. SEE REFERENCE SHEETS FOR CAP. ENSURE PULLING TAPE IS FREE OF OBSTRUCTIONS NOR <br />OPERATIONS AND SERVICE AT TRANSIT CENTER MUST BE MANUFACTURER'S REQUIREMENTS. CAUGHT ON JOINTS. P SNOPUD CONDUIT <br />2. EXISTING UTILITIES AND FEATURES ARE SHOWN BASED ON MAINTAINED AT ALL TIMES AND ANY SERVICE DISRUPTIONS <br />BEST AVAILABLE INFORMATION. CONTRACTOR IS RESPONSIBLE APPROVED BY ET SERVICE OPERATIONS. 11. CONTRACTOR WILL BE RESPONSIBLE FOR ANCHORING GA 15. CONTRACTOR TO RESTORE IN -KIND EXISTING LANDSCAPE CONSTRUCTION NOTES: <br />FOR VERIFYING ALL UTILITIES, SUBSURFACE CONDITIONS AND CABINET. SEE REFERENCE SHEETS FOR MANUFACTURER'S AREAS INCLUDING IRRIGATION SYSTEM IMPACTED BY WORK. <br />ELEVATIONS. CONTRACTOR TO PERFORM SURVEY WORK AS 6. CONTRACTOR TO PROVIDE WORK CONFORMING TO CURRENT REQUIREMENTS. 1O SAWCUT PAVEMENT <br />NEEDED TO CONFIRM AND RESTORE SURFACES TO EXISTING WSDOT STANDARD SPECIFICATIONS, MATERIAL AND <br />GRADES. NOTIFY ENGINEER IF THERE IS A CONFLICT WITH CONSTRUCTION REQUIREMENTS. 12. CONTRACTOR SHALL PROVIDE GA TEMPORARY SOCKET 2O REMOVE AND REPLACE EXISTING CURB. MATCH EXISTING CEMENT <br />PROPOSED WORK. FILLERS WITH ASSISTANCE FROM MOMENTUM DYNAMICS CONCRETE CURB. SEE DETAIL 8, DRAWING CD04. <br />7. CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARING PERSONNEL. 3O REMOVED EXISTING TREE. <br />3. CONNECTION TO SNOPUD TRANSFORMER VAULT BY SNOPUD TRAFFIC CONTROL PLANS AND ACQUIRING TRAFFIC CONTROL <br />VIA TRENCHLESS METHOD. PERMITS AS NECESSARY TO COMPLETE WORK. 13. CONTRACTOR SHALL MANDREL AND BRUSH UNDERGROUND ® PROTECT IN PLACE. <br />4. MOMENTUM DYNAMICS EQUIPMENT TO BE INSTALLED PER 8. SEE ELECTRICAL PLANS FOR CONDUIT, CONDUCTOR, AND CONCRETE ENCASED DUCT BANK ROUTED FROM CABINET IS <br />MANUFACTURER'S RECOMMENDATIONS. CONTRACTOR TO FIELD ELECTRICAL EQUIPMENT INFORMATION. TO PRECAST SOCKET TO ENSURE THAT SYSTEM S FREE OF 0 STORM DRAIN INLET PROTECTION. <br />COORDINATE EXACT PLACEMENT OF CHARGING EQUIPMENT OBSTRUCTIONS (DIRT, ROCKS, BURRS, ETC.). © REMOVE AND REPLACE EXISTING SIDEWALK IN ACCORDANCE WiTH COE <br />WITH OWNERS REPRESENTATIVE PRIOR TO CONSTRUCTION. 9. CONTRACTOR TO RESTORE EXISTING LANDSCAPE AREAS AND STD DWG 312. REMOVE AND REPLACE TO NEAREST CONTROL JOINT. <br />IRRIGATION SYSTEMS IN -KIND AND MAINTAIN UNTIL <br />COMPLETION. 0 CONTRACTOR TO PROVIDE SNOPUD TRANSFORMER VAULT, PER <br />SNOPUD REQUIREMENTS. <br />va u, a wA <br />oc roc Foc r c F c roc Foc\ °R°sS�q z�Nz O PLANS. <br />ELECTRICAL SERVICE SWITCHBOARD. SEE ELECTRICAL <br />SO 0 PROVIDE MOMENTUM DYNAMICS INVERTER CABINET. SEE GENERAL <br />J TROJAN WAY o CB#8 NOTE 4 AND REFERENCE SHEETS FOR MANUFACTURER'S <br />TYPE \ REQUIREMENTS. <br />_ FOG r 10 REMOVE AND REPLACE EXISTING CEMENT CONCRETE PANEL. MATCH <br />s es 551 - - - - -ss - js 1 - EXISTING GRADES. CONTRACTOR TO CONFIRM EXISTING PANEL AND <br />® FE / BASE COURSE THICKNESS UPON REMOVAL AND REPLACE IN -KIND. <br />L e e e <br />e 11 CEMENT CONCRETE PAVEMENT REHABILITATION, FULL PANEL <br />e e a �� J _ REPLACEMENT PER WSDOT STD PLAN A-60.10. <br />on <br />/ a 12 PROVIDE CONCRETE HOUSEKEEPING PAD. SEE GENERAL NOTES 3 <br />�98 <br />— — EXISTING SNOPUD / o� �mm�AND 4 AND REFERENCE SHEETS FOR MANUFACTURER'S <br />4 — PRIMARY DOWN POLE REQUIREMENTS. <br />a 96 __ —ram 13 CONSTRUCT MOMENTUM DYNAMICS FLUSH MOUNT INDUCTIVE <br />j \ 9� e 9 - 1 MATCH EXIST / ti CHARGING PAD (GA TRANSMITTING COIL) WITHIN CONCRETE PAVEMENT <br />/ 9 \ IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SEE <br />\v / - - e" s g" s o "ss - _ SEE GENERAL NOTE 3 I NOTE 4 AND DETAILS 1 AND 2, DRAWING CD01. <br />CDO 15 5 _ _ 14 REMOVE AND REPLACE EXISTING DETECTABLE WARNING SURFACE <br />C) - PER WSDOT STD PLAN F-45.10-03. MATCH EXISTING. <br />-- -- — � — -- � 10 11 omr <br />------ --- <br />-----II <br />II <br />I 1EXISTING S <br />-IS <br />15 RESTORE PAINT LINES TO MATCH EXISTING CONDITIONS. <br />COLLEGE STATION BUSWAY 4 BU <br />BAY F FLAG 6CEMENT CONCRETE PAVEMENT REHABILITATION, PARTIAL PANEL <br />_ <br />REPLACEMENT WITHOUT JOINT REPLACEMENT PER WSDOT STD <br />PLAN A-60.10. SEE DETAIL 2A, DRAWING CD01. <br />- <br />17 I E 5 I 17 INSTALL POLYSLICK BUS CURB, COLOR YELLOW. SEE DETAIL 7, <br />• ) cs - ��< - ____I I 14 I ��� w - DRAWNG CD04. <br />*---- -- ---- ---- I _ 35 S / 18 INTEGRAL CURB, SEE DETAIL 8, DRAWING CDO4. <br />College Station Totals EXISTING --I I_ 3 i I 19 EXISTING UNDERGROUND UTILITY CROSSING. EXISTING UTILITY <br />Replaced Impervious — 1 780 sf N I DEPTH UNKNOWN. CONTRACTOR TO VERIFY IN FIELD PRIOR TO <br />New Impervious - 170 sf' _ - s"s li - PASSENGER SHELTEf�ENGER SHELTER 4 g-123s S o CONSTRUCTION OF DUCT BANK. <br />EXISTING I ,y, <br />1 1 — I 20 PROVIDE TRANSFORMER. SEE ELECTRICAL PLANS. <br />f ' I EXISTING BUS 4 8 21 Sf 8 21 I 21 PROVIDE EQUIPMENT HOUSEKEEPING CONCRETE PAD. SEE <br />�� �, a <br />(a <br />I ELECTRICAL PLANS.BAY A F9 12Sf --- <br />tI"21 20 <br />E E I 2y I 13 �MATC�H EXIST <br />I <br />�� 17 10 11 TYP - 5 City of Everett Permit Review <br />_I - - - 15 - -- EX SD... - -� ; so \ EVERETT Status: Reviewed for Permit <br />04/18/2024 2:38:37 PM <br />f „0 S\ <br />rCDO1 MATCH EXIST 5 <br />� o _ <br />NO PARKING ao <br />m <br />I• Know whars below. <br />I x Cal before you dig. <br />• Determina to que esta baJo tlerra. o io' 20' 1. <br />Llai7la antes de excavar. i inch = 20 feet <br />Designed LEI <br />ELCON Drawing <br />Drawn TAM LC WASyG'f' EVERETT EVERETT TRANSIT INDUCTIVE COLLEGE STATION C01 <br />Checked ZRG 0» $men M PUBLIC WORKS CHARGING INFRASTRUCTURE CIVIL <br />NO. DATE IAPRVD I REVISION Design Review L-1 ♦&%)MTa INC. <br />She N.. <br />PLANS ISSUED FOR 100% 'rsus'°M /'w�,�� ��y�� 31rett,W00 9820StreeFIELD INSTALLATION DEMOLITION &SITE PLAN <br />BID CONST RECORD SON Everett, WA rettw <br />roNA1 ~ � � 415.257.8800 everettwa.gov REGION-10 I STATE -WA I FEDERAL AID#-#### ## <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD 4 v Z3 orm­i <br />