My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1230 13TH ST 2025 Plans 2026-04-10
>
Address Records
>
13TH ST
>
1230
>
Plans
>
1230 13TH ST 2025 Plans 2026-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2026 3:59:53 PM
Creation date
4/10/2026 3:59:37 PM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1230
Permit
PW2503-016
Year
2025
Notes
Drew Nielsen Park Playground Replacement Project
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drew Nielsen Park Playground Replacement - Stormwater Site Plan Drawings <br /> Colby Ave & 13th St, Everett, WA 98201 ` City of Everett Permit Services <br /> Parcels: 00409422802800, 004094228001001 00409422800400 EVERETT Reviewed for Permit 05/01/2025 <br /> WASHINGTON <br /> Temporary Erosion & Sediment Control (TESC) plan: <br /> Catch basins and inlets within 300'downstream of <br /> 1. Protect Drain Inlets: BMP C220: Storm Drain Inlet Protection the work shall be protected. <br /> r� ^r <br /> Install and maintain erosion control measures per City of Everett = _ <br /> Standards and per the direction of the Public Works'Inspector. a <br /> Remove upon completion of the project prior to final approval of the <br /> permit. - + <br /> I � <br /> Element#1: Preserve vegetation/mark clearing limits <br /> BMP C103-High Visibility Plastic or Metal Fence <br /> Element#2: Establish Construction Access j <br /> BMP C107-Construction Road/Parking Area Stabilization <br /> Element#3:Control Flow Rates <br /> Not applicable to this project <br /> Element#4: Install Sediment Controls I ;1 <br /> BMP C235-Wattles t' N <br /> Element#5:Stabilize Soils � <br /> BMP C123-Plastic Covering <br /> Element#6: Protect Soils ( �. <br /> Not applicable to this project <br /> Element#7: Protect Drain Inlets <br /> BMP C220-Storm Drain Inlet Protection <br /> Element#8:Stabilize Channels and Outlets <br /> Not applicable to this project <br /> Element#9:Control Pollutants <br /> BMP C151 -Concrete Handling _ <br /> BMP C152-Sawcuttin and Surfacing Pollution Prevention <br /> 9 9 " i '1' � DL J57 12" PE 1 <br /> BMP C153-Material Delivery,Storage,and Containment / I , �'"` t _ IL J31 <br /> Element#10:Control Dewatering <br /> . '.•�. .. fir,. , �1F 3:33:?� <br /> Not applicable to this project <br /> Element#11:Maintain BMPs 4V <br /> BMP C150-Materials on Hand Ii { qP PVC • IL J32 <br /> Element#12:Manage the Project 13T C <br /> BMP C150-Material On Hand CB J27 ' <br /> BMP C162-Scheduling 0 w 2 ' PE DL J49 12 PE <br /> Element#13:Protect Low Impact Development _ _ Wo3470 ,; <br /> Not applicable to this project. �, 32� 7 2016 \ w CB J <br /> . - -�i--- - 116 <br /> I <br /> CF3 J25 a.n.L - 1 DMH J03 DL J59 , `�} �' •t <br />
The URL can be used to link to this page
Your browser does not support the video tag.