Laserfiche WebLink
CONTINUED ON DRAWING E6.3 K ENGINEERS INC. <br /> TO UNIT SUBSTATION NUS-H4 n 208 Third Street <br /> 1 Lynden, WA. 98264 W <br /> LS OR NORMAL/OPT EQ FAX (360) 354-6794 A <br /> TO SWBD MSB-G IN PARKING t Uj <br /> B B TO FIRE PUMP GARAGE. W <br /> Cl- <br /> z <br /> rn <br /> Z U <br /> 3750/4200/4688KVA, <br /> KNAN/KNAN-65/KNAF m L <br /> 12.7KV:480Y/277 am O <br /> _ 30,4W,5.75%Z Ca a <br /> 1 � 6 00 600 600AF I 3200AF 126000AF 600AF <br /> 000T 1 3000AT r 0AT A 00ATc c c Tc MOAT <br /> SA <br /> K 5000AF <br /> �A 5000AT <br /> 600AS <br /> 600AS 250AF :o <br /> K K V v G <br /> TO UNIT SUBSTATION NUS-Hi N.C. �I \1 <br /> A N.O. B = <br /> 2727 Oakes Ave. <br /> NUS-H2 HOSPITAL NORMAL POWER Swte 100 <br /> 5000A BUS(LEVEL B-SOUTH) Everett,WA 98201 <br /> 12.47kV//480Y/277V 30 4W <br /> 100,000 AIC®480V REVISIONS <br /> SERVICE ENTRANCE RATED <br /> B B B B <br /> G Q R..of 07 <br /> MEDIUM VOLTAGE FEEDER SCHEDULE v� <br /> TO CENTRAL PLANT G <br /> C FEEDER COPPER CONDUCTORS FEEDER a <br /> TYPE AMPACITY D� <br /> RACEWAY WIR 44 94E o ,p <br /> ISTEFYq' ' <br /> A 6" (3)#750kcmil 15KV,MV-105 447 �SS7aNat Doti <br /> 133%EPR,(1)#4/OG 600V XHHW (NOTE 1) <br /> �--51ERVICE DISCONNECT SWITCHES B 5" (3)#350kcmil 15KV,MV-105 415 <br /> 133%EPR,(1)#1/OG 600V XHHW <br /> (3)#4/0 15KV,MV-105 <br /> TOWER"B" 600AF 300AS CUP"A" 300AF I CUP"B" 600AS TOWER"A" C 4 133%EPR,(1)#1/OG 600V XHHW 315 <br /> N.C. <br /> C 600AS N C 600AS N C 600AS N.Q. 600AS <br /> I 2E (2)4" (3)350kcmil 5KV,MV-105 830 }� <br /> 133%EPR,(1)#1/OG,600V XHHW IN EA. L <br /> JJ L L 3E1 (3)4" (3)350kcmil 5KV,MV-105 810 Co <br /> SERVICE POINT SERVICE POINT 133%EPR,(1)#2/OG,600V XHHW IN EA. (NOTE 1) ( , <br /> A A A A A A 3E2 (3)4" (3)350kcmil 5KV,MV-105 873 �••! <br /> A 133%EPR,(1)#2/OG,600V XHHW IN EA. (NOTE 1) <br /> F 51. (3)500kcmil 5KV,MV-105 470 <br /> (2)6"RO 133%EPR,(1)#1/OG,600V XHHW (NOTE 2) <br /> TO EXISTING UTILITY COMPANY F1 5" (3)500kcmil 5KV,MV-105 348 O <br /> EQUIPMENT ON SITE 133%EPR,(1)#1/OG,600V XHHW (NOTE 1) <br /> FOR FUTURE SERVICE�PLAN (l) <br /> / 1 <br /> EXISTING COLBY CAM `J <br /> BUILDINGS WEST OF H NOTE 1: FEEDER AMPACITY BASED ON DUCT BANK STEADY STATE <br /> TOWER.REFER TO SIT —2 THERMAL/AMPACITY ANALYSIS. <br /> SHEET E1.02 NOTE 2: FEEDER AMPACITY BASED ON ONE CIRCUIT IN DUCT BANK <br /> PER NEC TABLE 310.77. <br /> TO EXISTING UTILITY COMPANY F- ill F- F- U N <br /> QUIPMENT ON SITE i 00 <br /> •O Co T m <br /> P.U.D.SW#4 P.U.D.SW#5 L P.U.D.SW#6 L CIO C:) L. <br /> I� O P.U.D.PRIMARY P.U.D.PRIMARY P.U.D.PRIMARY r Wm <br /> PM1 METER EQUIPMENT PM2 METER EQUIPMENT PM3 METER EQUIPMENT <br /> III N. 2364 <br /> KL <br /> EQUIPMENT aHcarco er BD <br /> LOCATED IN <br /> P.U.D. <br /> SWITCH <br /> ROOM AT BID SET <br /> PARKING <br /> GARAGE 10-11-24 <br /> L L L L L PARTIAL PRIMARY POWER RISER DIAGRAM - NORMAL SYSTEM ELECTRICAL - <br /> RU.D.SW#1 P.U.D.SW#2 P.U.D.SW#3 POWER SYSTEM <br /> RISER DIAGRAM <br /> UTILITY#2 UTILITY#3 UTILITY#1 <br /> NORTON FEEDER DELTA FEEDER 10TH ST.FEEDER <br /> 12.47KV 12.47KV 12.47KV E 6.1 <br /> L City of Everett Permit Services <br /> EVERETT Reviewed for Permit 08/19/2025 <br />