Laserfiche WebLink
SEISMIC ROOF CURB ATTACHMENT DETAIL HVAC ABBREVIATIONS HVAC LEGEND HVAC NOTES <br /> I AFF ABOVE FINISHED FLOOR 1. DUCT INSULATION TO MEET THE REQUIREMENTS OF <br /> �2/I BDO BACKDRAFT DAMPER O O INLINE EXHAUST FAN(S) <br /> SECT-ION C403.10 OF THE 2021 WSEC AND SECTION 604 OF <br /> BTUH BRITISH THERMAL UNIT PER HOUR THE IECC(INTERNATIONAL ENERGY CONSERVATION CODE). <br /> 4" CD CEILING DIFFUSER 2. SMOKE DETECTOR(S)INSTALLED IN MAIN RETURN AIR <br /> CFM CUBIC FEET PER MINUTE 0ROOFTOP EXHAUST FAN <br /> CU CONDENSING UNIT DUCTS PER SECTION 606 OF THE 2021 IMC.HVAC SMOKE DUCT <br /> ��o DETECTORS SHALL SHUT DOWN POWER TO THE UNIT UPON <br /> 4„ �� DB DECIBEL ACTIVATION AND A"SUPERVISORY"ZONE SHALL BE INITIATED <br /> DH DUCT HEATER <br /> o 1-1/2" DOAS DEDICATED OUTSIDE AIR SYSTEM SIDEWALL EXHAUST FAN AT FIRE ALARM PANEL UPON SMOKE DUCT DETECTOR <br /> \ ON DOWN ACTIVATION.2021 IMC SECTION 606.4&606.4.1. <br /> 3" \ EC EVAPORATOR COIL 3. SUPPLY&RETURN AIR DUCT IS MIN.SI IN UNCONDITIONED UNIVERSAL <br /> i EER ENERGY EFFICIENCY RATIO SPACES&MIN. SE WHEN LOCATED OUTSIDE OF BUILDING AS <br /> i� o EF EXHAUST FAN VAV FAN BOX PER THE INGL WSECC4EHVA1.2. REFRIGERATION <br /> EG EXHAUST GRILLE 4. ALL SINGLE PACKAGE HVAC UNITS SHALL BE INSTALLED <br /> ERV ENERGY RECOVERY VENTILATOR WITH ECONOMIZERS PER MANUFACTURER'S INSTALLATION <br /> ESP EXTERNAL STATIC PRESSURE -AIR CONDITIONING-HEAT PUMPS-REFRIGERATION- <br /> 4" � CEILING EXHAUST FAN INSTRUCTIONS PER 2021 IMC,SECTION 403 AND SHALL <br /> \ �3" EXH EXHAUST OPERATE PER 2021 WSEC,SECTION C403.5.1. CONTRACTORS LICENSE NUMBER: COLOSCI-805BP <br /> y FCU FAN COIL UNIT FD FIRE DAMPER,FLOOR DRAIN GAS METER <br /> 5. EQUIPMENT INSTALLATION INSTRUCTIONS TO BE ON-SITE AUBURN: (253)939-5501 TACOMA: (253)922-3141 <br /> O <br /> FOR INSPECTIONS. $EATTLE: (253)839-21ffi FAX: (253)735-3432 <br /> FPM FEET PER MINUTE RTU 6.ALL HVAC EQMT.TO BE LABELED TO THE SPACE SERVED. P.O.BOX 614-AUBURN,WASHINGTON 98071 <br /> GA FIRE AND SMOKE DAMPER ZD12 <br /> GA GAUGE n VVT DAMPER 7. DUCTS TO BE SUPPORTED AT EACH DIRECTION CHANGE ©UNIVERSAL REFRIGERATION DRAWING-2001 <br /> NEOPRENE GASKET GF GAS FURNACE L�J VERTICAL AT 12-0"MAX.,HORIZONTAL AT 1Y-O"MAX.WITH <br /> GRID GRILLE,REGISTER,DIFFUSER STRAP,OR 8'-0"MAX.TRAPEZE SUPPORT. z <br /> WOOD NAILER HP HORSEPOWER,HEAT PUMP T THERMOSTAT 8.THERMOSTAT TO BE SEVEN-DAY TYPE AND HAVE NIGHT 0 <br /> ID INSIDE DIMENSION SETBACK WITH 5 DEGREE DEADBAND. I- <br /> Hp INDOOR(SECTION)HEAT PUMP 9.THE HVAC INSTALLATION SHALL BE COMPLETE WHEN ALL d <br /> NOTE 2 NOTE 2 IRH INFRARED HEATER SECTIONS OF 2021 WSEC C408 HAVE BEEN SATISFIED.THIS fr <br /> La SECURE BRACKET TO CURB KW C) <br /> KILOWATT O T-BAR SUPPLY DIFFUSER SHALL INCLUDE AS-BUILT DRAWINGS,SUBMITTALS,0&M <br /> WITH(4)#10 SCREWS MBH THOUSAND BTU PER HOUR MANUALS,SYSTEM BALANCE REPORT,AND A COMMIS-SIONING LU <br /> MCD MOTORIZED CONTROL DAMPER 0 <br /> REPORT. <br /> 18 GA.RESTRAINT BRACKET NC NOISE CRITERIA <br /> DUCT SEALING SHALL MEET REQUIREMENTS OF 2021 10 <br /> T-BAR RETURN GRILLE . <br /> -FACTORYNIC NOT IN CONTRACT ❑ 0 <br /> CURB <br /> WSEC C403.10.2. DUCT WORK WHICH IS DESIGNATED TO J) <br /> NTS NOT TO SCALE J) cn <br /> OPERATE AT PRESSURES ABOVE 1/2"WATER COLUMN STATIC <br /> NOTES: OBD OPPOSED BLADE DAMPER j F- <br /> OC ON CENTER ® HARDLID SUPPLY DIFFUSER PRESSURE SHALL BE SEALED AS FOLLOWS:1. STATIC <br /> 1.ATTACH BRACKET TO INSIDE TOP OF CURB USING TEK SCREWS SUPPLIED AS SHOWN, PRESSURE 1/2 INCH TO 2 INCHES:SEAL ALL TRANSVERSE GE m <br /> ATTACH MOUNTING BRACKET TO CURB BEFORE MOUNTING BEFORE MOUNTING UNIT ON CURB. OD OUTSIDE DIMENSION OR DIAMETER Lu <br /> OHP OUTDOOR HEAT PUMP JOINTS AND LONGITUDINAL SEAMS. SPIRAL LOCK SEAMS IN <br /> 2.AFTER SETTING UNIT ON CURB,ATTACH BOTTOM OF BRACKET TO BASE RAIL ON UNIT WITH a <br /> (4)#10 TEK SCREWS ON EACH SIDE OF BRACKET AS SHOWN. OSA OUTSIDE AIR HARDLID RETURN GRILLE ROUND AND FLAT OVAL DUCT WORK DO NOT REQUIRE SEALING; <br /> OSCI OWNER SUPPLIED CONTR.INSTALLED HOWEVER,OTHER SEAMS SHALL BE SEALED. IL N <br /> 3.A QUANTITY OF FOUR(4)SEISMIC BRACKETS PER ROOFTOP PACKAGE UNIT. POC POINT OF CONNECTION 11. 2021 WSEC FORMS,DUCT PLANS,BALANCING FEATURES, Q T <br /> 4.ONE SEISMIC BRACKET IS TO BE INSTALLED ON EACH CORNER OF THE RA RETURN AIR FD FIRE DAMPER AS WELL AS VENTILATION REQUIREMENTS(AS PER TABLE 0 a0 <br /> ROOFTOP PACKAGE UNIT. RAG RETURN AIR GRILLE 403.3.1.1,2021 IMC MINIMUM VENTILATION RATES)AND <br /> RPM REVOLUTIONS PER MINUTE FSD FIRE SMOKE DAMPER OCCUPANCY,ALONG WITH A MECHANICAL PERMIT AT THE TIME j <br /> Rooms shall be unheated,or heated b heat RTU ROOFTOP UNIT L- W <br /> y SA SUPPLY AIR VOLUME DAMPER OF THE TENANT IMPROVEMENT PERMIT. � <br /> pumps,or electric resistance heaters shall be SG SUPPLY GRILLE <br /> 287 watts maximum in toilet rooms 112 and SIP STATIC PRESSURE <br /> 113 as calculated per WSEC-C403.1.4 SSG SIDEWALL SUPPLY GRILLE SO SMOKE DETECTOR SCOPE OF WORK <br /> exception 1 TBD TO BE DETERMINED co <br /> TG TRANSFER GRILLE FLEXIBLE DUCTSA/RA JOB# M3025-016H Q O <br /> TYP TYPICAL CV <br /> ELECTRIC WALL HEATS CHEDULE UH VUNIT ARIABLE <br /> 1.INSTALL(2)ENERGYREC PACKAGE OVERYVFTOP EATLATORS PUMPS. CD <br /> VFD VARIABLE FREQUENCY DRIVE ® ROUND DUCT UP 2.INSTALL(2)ENERGY RECOVERY VENTILATORS. � ICE) <br /> VTR VENT TO ROOF 3.INSTALL(7)EXHAUST FANS WJASSOC.VENTING.VVT Q> <br /> ID BRAND NAME MODEL NUMBER KW OLTAGE LOCATION VARIABLE VOLUME AND TEMPERATURE 4.INSTALL(2)ELECTRIC WALL HEATERS. <br /> ROUND DUCT DOWN 5.INSTALL(1)HEAT PUMP SPLIT SYSTEM. <br /> EH-1 KING PAW1215 1.5 115/1 TOILET 113 6.INSTALL(12)HVLS FANS. Q <br /> EH-2 KING PAW1215 1.5 115/1 TOILET 112 10x10 CD 7.INSTALL DUCTWORK,GRILLES&REGISTERS. <br /> 300CFM-10'8 DIFFUSER TAG J LU <br /> Cc <br /> ERV DOAS SCHEDULE m� w <br /> ID BRAND NAME MODEL NUMBER CFM SIPHP/AMP WPH SOUND LOCATION WEIGHT UJ <br /> RATING � O <br /> ERV-1 DAIKIN VAM300GVJU 300 .64" 1.6 A 208/1 37 d6 ABOVE ACT CEILING 71 LBS W <br /> ERV-2 DAIKIN VAM300GVJU 300 .64" 1.6 A 208/1 37 dB ABOVE ACT CEILING 71 LBS U O <br /> W O <br /> LO <br /> FAN SCHEDULE ° <br /> o <br /> ID BRAND NAME MODEL NUMBER CFM SP HP/AMP FLOW WPH SOUND DUCT LOCATION <br /> RATING Fan selection shall comply with LU <br /> EF-1 BROAN AE110K 90 .25 0.3 A CV 115/10 1.0 SONES 4"0 TOILET 110 AMCA 230. See WSEC-C403.8.6. Z <br /> W <br /> EF-2 BROAN L200 187 .375 1.8 CV 120/10 2.7 SONES 8"0 WOMEN 113 <br /> EF-3 BROAN AE110K 90 .25 0.3 A CV 115/10 1.0 SONES 4"0 TOILET 109 HVLS FAN SCHEDULE L1J Q <br /> EFA BROAN L200 187 .375 1.8 CV 120/10 2.7 SONES 8"0 MEN 112 = <br /> EF-5 BROAN AE110K 90 .25 0.3 A CV 115/10 1.0 SONES 4"0 UTILITY 111 ID BRAND NAME MODEL NUMBER DIAMETER HP/W VOLTAGEIPHASE AMPS WEIGHT <br /> EF-6 BROAN L200 187 .375 1.8 CV 120/10 2.7 SONES 8"0 TOILET 113 >LJLJ co <br /> EF-7 BROAN L200 187 .375 1.8 CV 120110 2.7 SONES 8"0 TOILET 112 HVLS 1-12 BIG ASS FANS BASIC 6 24 2.0 460/3 10.0 231 LBS Q <br /> O <br /> O <br /> SPLIT SYSTEM HEAT PUMP SCHEDULE m to <br /> ID BRAND NAME MODEL NUMBER COOLING(BTUH) HEATING(BTUH) LIQUID LINE SUCTION LINE SEER2 VOLTAGE/PHASE HSPF2 MCA MOCP WEIGHT LOCATION&NOTES <br /> MINIMUM RATED MINIMUM RATED <br /> PRINT/PLOT DATE: <br /> OHP-1 DAIKIN RXF24AXVJU 7,000 26,400 6,200 28,600 1/4" 5/8" 21.0 208/1 9.1 16.34 20.0 101 LBS ROOF <br /> IHP-1 DAIKIN FTXF24AXVJU 7,000 26,400 6,200 28,600 1/4" 5/8" 21.0 208/1 9.1 1.0 - 30.5 LBS DATA ROOM 115 DRAFTER: <br /> AGG <br /> DESIGNER: <br /> PACKAGE ROOF-TOP HEATPUMP EQUIPMENT SCHEDULE ARW <br /> SMOKE HEATING GROSS COOLING EFFICIENCY EFFICIENCY PROJECT MANAGER: <br /> ID BRAND NAME MODEL NUMBER AREA OF SERVICE CFM S.P. INPUT TOTAL CAPACITY CAPACITY SEER SEER2 EER IEER HSPF HSPF2 OR COP OR COP2 WPH MCA MOCP SOUND WEIGHT ARW <br /> DETECTOR (kW) (Btuh) (Btuh) HIGH/LOW HIGH/LOW RATING JOB NUMBER: <br /> RTU-1 CARRIER 50FEQM07A2A6 2ND FLOOR OFFICE 2,400 YES 1.0" 19.70 53,900 73,170 - 11.20 15.0 - 2.25/3.40 - 460/3 48 50 79.0 dB 759 LBS L City of Everett Permit Services M3025-016H <br /> RTU-1 CARRIER 50FEQA04A2A6 1 ST FLOOR OFFICE 1,200 NO 1.0" 12.90 33,500 37,120 13.40 - - 6.7 2.10/3.60 460/3 31 35 75.4 dB 636 LBS EV_ERETT Reviewed for Permit 05/19/2025 SHEET NUMBER: <br /> RTU-1 CARRIER 50FEQA04A2A6 1 ST FLOOR OFFICE 1,200 NO 1.0" 12.90 33,500 37,120 13.40 6.7 2.10/3.60 460/3 31 35 75.4 dB 636 LBS <br /> *UNIT INCLUDES FACTORY ECONOMIZER CAPABLE OF 100%OSA n n <br /> SHALL BE <br /> NOTE:These plans are diagrammatical only. SUCH HVAC <br /> HAT ECONOMIZER OPERATIONS STEM DESIGNED&ECONOM(ZER DOES NOTROLS INCREA E THE PENDING C 1 T \V/I Y APPROVAL I C <br /> Please verify all dimensions at job site. BUILDING HEATING ENERGY USE DURING NORMAL OPERATION <br /> (WSEC 2021-C403.5.3) <br />