My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE 2026-05-05
>
Address Records
>
19TH AVE SE
>
10200
>
10200 19TH AVE SE 2026-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2026 4:14:29 PM
Creation date
4/13/2026 11:58:49 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: M2503-007 Description: HVAC Upgrades at Costco Everett <br /> Applied:3/4/2025 Approved:3/31/2025 Site Address: 10200 19TH AVE SE <br /> Issued:4/1/2025 Finaled:4/28/2025 City,State Zip Code: EVERETT,WA 98208-4256 <br /> Status: FINALED Applicant: Kade Lee <br /> Parent Permit: Owner:COSTCO WHOLESALE CORP <br /> Parent Project: Contractor: HOOVER CMRCL REFRIGERATION INC <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 4/9/2025 4/9/2025 MECH 04-ROUGH JEFF M RHODE APPROVAL see notes <br /> IN <br /> Notes: <br /> 4/8/2025 5:55 AM Kade Lee <br /> Looking for rough-in/ok to insulate.Thank you! <br /> Contact Name:Kade Lee <br /> Site Address:10200 19TH AVE SE <br /> Phone:4258306381 <br /> e-Mail:kadel@hooverrefrigeration.com <br /> -rough ducting ok for insulation-verify rooftop unit at final-verify condensate disposal location at final <br /> 4/9/2025 4/9/2025 MECH 06 7JEFF M RHODE CANCELLED see notes <br /> INSULATION <br /> Notes: <br /> 4/8/2025 5:55 AM Kade Lee <br /> Looking for rough-in/ok to insulate.Thank you! <br /> Contact Name:Kade Lee <br /> Site Address:10200 19TH AVE SE <br /> Phone:4258306381 <br /> e-Mail:kadel@hooverrefrigeration.com <br /> -duplicate inspections generated rough ducting approval on mechanical rough in inspection,insulation not complete at inspection will verify at final <br /> 4/28/2025 4/28/2025 MECH 08-FINAL** JEFF M RHODE APPRVD-PERMIT see notes <br /> FINAL <br /> Notes: <br /> 4/25/2025 10:59 AM Kade Lee <br /> Please also call Cody @ 360.920.9381 when arriving for inspection.Thank you! <br /> Contact Name:Kade Lee <br /> Site Address:10200 19TH AVE SE <br /> Phone:4258306381 <br /> e-Mail:kadel@hooverrefrigeration.com <br /> -duct work and insulation ok-work above contact lens center ok-submit balance report for Final <br /> balance report submitted <br /> I <br /> Printed: Monday, 13 April, 2026 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.