Laserfiche WebLink
DEMOLITION SYMBOL LEGEND <br /> EXISTING WALLS TO BE DEMOLISHED wo <br /> MID ARCHITECTS <br /> EXISTING WALLS TO REMAIN <br /> an6p.S.IN 46216 <br /> 317.55-822 <br /> �\ F EXISTING DOOR TO BE DEMOLISHED <br /> \ <br /> \� EXISTING DOOR TO REMAIN <br /> DEMOLITION GENERAL NOTES <br /> A. THE DEMOLITION DRAWINGS SHOWN AS PART OF THIS SET ARE INTENDED TO SHOW THE <br /> GENERAL SCOPE AND EXISTING CONDITIONS OF THE PROJECT AND THE GENERAL EXTENTS OF <br /> THE DEMOLITION.IT IS NOT THE INTENT OF THE DRAWINGS TO BE ALL INCLUSIVE OF ALL <br /> DEMOLITION NECESSARY FOR NEW CONSTRUCTION AND ARE MEANT TO AID THE CONTRACTOR <br /> IN EVALUATION OF THE EXTENT OF DEMOLITION.THE CONTRACTOR(S)ARE RESPONSIBLE FOR <br /> VERIFYING ALL EXISTING CONDITIONS,COORDINATING ALL NECESSARY REQUIREMENTS AND <br /> PERFORMING ALL DEMOLITION REQUIRED FOR NEW CONSTRUCTION WHETHER SHOWN OR <br /> NOT. <br /> B. FIELD INSPECT DEMOLITION SCOPE PRIOR TO REMOVAL.INSURE REMOVAL DOES NOT IMPAIR <br /> STRUCTURAL INTEGRITY OF EXISTING STRUCTURE TO REMAIN.IF FIELD INSPECTION INDICATES <br /> STRUCTURAL INTEGRITY MAY BE IMPAIRED,CONTRACTOR(S)SHALL NOTIFY ARCHITECT/ <br /> STRUCTURAL ENGINEER AND OWNER IMMEDIATELY AND TAKE IMMEDIATE ACTION TO ENSURE <br /> SAFETY OF STRUCTURE WHILE PERMANENT SOLUTION IS DEVELOPED. <br /> C. DO NOT SCALE ANY DRAWINGS.FIELD VERIFY ALL EXISTING CONDITIONS.REPORTANY <br /> DISCREPANCIES TO THE ARCHITECT FOR RESOLUTION. <br /> u D. GENERAL CONTRACTOR TO COORDINATE ALL DEMOLITION WORK AMONG ALL TRADES. <br /> _ E. VERIFY ALL EXISTING WALL,FLOOR,CEILING,AND ROOF CONSTRUCTION TO DETERMINE <br /> EXTENT AND METHODS OF DEMOLITION REQUIRED FOR NEW CONSTRUCTION. <br /> 10 \\ F. VERIFY LOCATION OF EXISTING UTILITIES AND UNDERGROUND CONDUITS,CHASES,AND SOIL <br /> CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION Cn <br /> \\ OFrG. MAINTAIN ALL EXISTING EXITS AND EGRESS FOR THE DURATION OF THE CONSTRUCTION. <br /> uj <br /> 10 — H. ALL EXISTING SPACES IN OPERATION SHALL BE MAINTAINED WATER TIGHT THROUGOUT <br /> O ILA CONSTRUCTION.EXISTING SPACES REMAINING IN OPERATION SHALL BE MAINTAINED DUST J <br /> FREE THROUGHOUT CONSTRUCTION.PHASED AREAS OF WORK ACHIEVING TEMPORARY W <br /> CERTIFICATE OF OCCUPANCY SHALL THEREAFTER BE MAINTAINED DUST FREE FOR THE <br /> 17F BALANCE OF CONSTRUCTION. Q W <br /> N J <br /> J z� I. IF HAZARDOUS MATERIALS ARE UNCOVERED DURING DEMOLITION OR CONSTRUCTION NOTIFY CO <br /> UP L��� THE ARCHITECT AND OWNER IMMEDIATELY. O <br /> \\ JW�L J. OWNER WILL REMOVE FURNISHINGS AND LOOSE EQUIPMENT PRIOR TO DEMOLITION. Lu ` W <br /> \\\ 18 K. REMOVE AND/OR DEMOLISH ITEMS INDICATED.THE OWNER HAS THE RIGHT OF FIRST REFUSAL ♦^ s <br /> ON EXISTING MATERIALS AND EQUIPMENT REMOVED FROM THE SITE.VERIFY WITH OWNER ALL Y/ <br /> EXISTING MATERIAL,CASEWORK,EQUIPMENT,LIGHT FIXTURES,SYSTEM FURNISHINGS,DOORS, <br /> OR FRAMES WHICH SHALL BE SALVAGED PRIOR TO REMOVAL.TURN OVER SALVAGE I <br /> M <br /> i� <br /> ATERIALS TOOWNER ANDIOR STORE ON SITE AS INDICATED BY THE OWNER.CONTRACTOR <br /> SHALL PROPERLY DISPOSE OF REMAINING ITEMS AND REMOVE FROM THE SITE IMMEDIATELY. O W Q <br /> L. <br /> REFER TO PROJECT MANUAL FOR ADDITIONAL DEMOLITION REQUIREMENTS. Ill a <br /> M. REFER TO MECHANICAL,ELECTRICAL,PLUMBING,AND STRUCTURAL DRAWINGS FOR W <br /> ADDITIONAL INFORMATION,DEMOLITION WORK,AND COORDINATION REQUIREMENTS. U) O <br /> N. FOR INFILLING ALL PLUMBING TRENCHES IN CONCRETE,TIE NEW AND EXISTING CONCRETE W J O <br /> 18 TOGETHER USING#4 REBAR @ 16"O.C.TYP. a _j <br /> \ 10 -0v 0. REMOVE ALL EXISTING WINDOW TREATMENTS(MINI-BLINDS,ETC)AND PATCH WINDOW JAMBS / LL <br /> \ OR HEADS AS REQUIRED. z <br /> W O O <br /> P. ALL EXISTING LIGHTING,EXIT LIGHTING,EMERGENCY LIGHTING TO REMAIN UNLESS OTHERWISE O <br /> NOTED ON REFLECTED CEILING PLAN OR ELECTRICAL LIGHTING PLAN. J <br /> Q. ALL CASEWORKTO BE REMOVED THROUGHOUT. O <br /> \\ III <br /> R. G.C.TO GPR THE EXISTING FLOOR SLAB TO DETERMINE THE EXACT LOCATION OF THE EXISTING Gt 2 <br /> SANITARY LINE.(GPR=GROUND PENETRATING RADAR) �` W <br /> S. IT IS THE GENERAL CONTRACTOR'S CHOICE TO REPLACE THE EXISTING GYPSUM BOARD ALONG <br /> THE EXTERIOR KNEE WALL IN ITS ENTIRETY WITH NEW GYP.BOARD IF DEEMED MORE <br /> ECONOMICAL AT NO ADDITIONAL COST TO THE OWNER.INDICATE CHOICE WITH BID O <br /> SUBMISSION. <br /> T. ADDITIONAL DEMO WORK MAYBE REQUIRED FOR NEW RECESSED EQUIPMENT,REFER TO <br /> 18 \\ EQUIPMENT PLANS FOR MORE INFORMATION. <br /> / DEMOLITION KEYNOTES <br /> 0 D REMOVE EXISTING SUSPENDED CEILING TILE,DIFFUSERS,AND LIGHTING AS REQUIRED BY <br /> NEW WORK.EXISTING CEILING GRID TO REMAIN. <br /> EXISTING SUSPENDED CEILING GRID,TILE TO REMAIN.EXISTING LIGHTING TO BE REMOVED AND <br /> REPLACED. <br /> 18 \\\ \ qp 3 EXISTING GYPSUM BOARD CEILING AND LIGHTING TO BE REMOVED.REFER TO REFLECTED CEILING <br /> \ \\ \ O PLAN FOR NEW CEILING WORK. <br /> \\ \\\ > O EXISTING GYPSUM BOARD CEILING TO REMAIN.ANY EXISTING LIGHTING TO BE REMOVED AND <br /> 5 REPLACED.PATCH CEILING TO MATCH EXISTING FINISH.REFER TO REFLECTED CEILING PLAN FOR <br /> NEWWORK. <br /> /\> /\^^\\ O REMOVE EXISTING PLUMBING FIXTURE IN ITS ENTIRETY. REG ED <br /> REFER TO PLUMBING PLANS FOR REMOVAL OF EXISTING FLOOR DRAINS AND DRAIN LINES. ARC TE T <br /> REMOVE CONCRETE SLAB IN THIS CROSS HATCHED AREA.COORDINATE EXACT LOCATIONS OF PlulS r.x e <br /> j\<\ DEMOLITION WORK WITH ARCHITECTURAL FLOOR PLAN'S NEW CONSTRUCTION. $ DE WASH <br /> REMOVE PORTION OF WALL FOR NEW DOOR/OPENING.REFER TO ARCHITECTURAL PLAN&DOOR <br /> // �� \ \\ SCHEDULE FOR INFORMATION. _ 1 <br /> 16 \1 O O REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK..REFER TO ARCHITECTURAL PLAN& <br /> ---9 DOOR SCHEDULE FOR INFORMATION. <br /> / \ \ <br /> ^ �\ REMOVE EXISTING DOOR AND FRAME AS REQUIRED FOR NEW WORK.PATCH AND REPAIR WALL <br /> a �'// 18 /� 13 \ \\� 0 10 AS REQUIRED BY NEW WORK.STORE DOOR FOR REUSE. _ <br /> 0 \ <br /> REMOVE EXISTING SECTIONAL DOOR AND FRAME AS REQUIRED FOR NEW WORK.COORDINATE <br /> WITH OWNER WHETHER OR NOT TO BE SALVAGED.NEW WALL INFILL TO BE INSTALLED AT <br /> \\ \ }) \ \ 0 O EXISTING OPENING MATCH EXISTING MATERIALS AND FINISHES. <br /> 0 12 EXISTING WINDOW TO REMAIN.REMOVE THE EXISTING SECTIONAL DOOR IN ITS ENTIRETY.PATCH <br /> & / \\ AND REPAIR WALLS AND CEILING AS REQUIRED BY NEW WORK. <br /> REMOVE ALL CASEWORK/SHELVING IN ITS ENTIRETY. <br /> 18 14 REMOVE WOOD STAIRS,LANDING AND RAILINGS IN THEIR ENTIRETY. <br /> 15 GC TO VERIFY CONDITION OF WOOD PLATFORM FLOOR UNDER EXISTING TOILET.REFRAME AND <br /> PROVIDE 1 1/2"CONCRETE TOPPING TO BE FLUSH WITH ADJACENT SLAB AS NECESSARY. <br /> II 6 EXISTING ALUMINUM STOREFRONT DOOR TO BE REMOVED.PROVIDE NEW INSULATED GLAZING TO <br /> MATCH EXISTING. <br /> i6 II <br /> 17 REMOVE AND SALVAGE COUNTER,BASE AND WALL CABINETS AS REQUIRED BY NEW WORK. <br /> REINSTALL SINK IN ITS ORIGINAL LOCATION IN NEW COUNTERTOP. <br /> 18 18 REMOVE EXISTING FLOOR FINISHES AND PREPARE EXISTING AREAS FOR NEW FLOOR MATERIALS <br /> 16�Iu- <br /> 025 <br /> PROJECT NUMBER: -- <br /> SHEET: DEMOLITION FLOOR <br /> PLAN-STREET <br /> LEVEL <br /> A08 <br /> N <br /> 1 SECOND FLOOR EXISTING PLAN WI DEM llFID NllANlsHlGIVEN'ED <br /> �NAGREEMENT WITHMDARCHITECTS <br /> TME <br /> NO—USE OR DUPLI <br /> T"N <br /> BE MADE WITHOUTTHE PRIOR MAY <br /> WRITTEN CONSENT OF <br /> L City of Everett Permit Services Mo ARCHITECTS <br /> EVERETT Reviewed for Permit 04/18/2025 commoner RIGHTS'Z HEaEBY <br />