Laserfiche WebLink
DEMOLITION SYMBOL LEGEND <br /> EXISTING WALLS TO BE DEMOLISHED wo <br /> MID ARCHITECTS <br /> EXISTING WALLS TO REMAIN <br /> an6p.S.IN 46216 <br /> 317.55-822 <br /> F EXISTING DOOR TO BE DEMOLISHED <br /> \ <br /> \� EXISTING DOOR TO REMAIN <br /> DEMOLITION GENERAL NOTES <br /> A. THE DEMOLITION DRAWINGS SHOWN AS PART OF THIS SET ARE INTENDED TO SHOW THE <br /> GENERAL SCOPE AND EXISTING CONDITIONS OF THE PROJECT AND THE GENERAL EXTENTS OF <br /> THE DEMOLITION.IT IS NOT THE INTENT OF THE DRAWINGS TO BE ALL INCLUSIVE OF ALL <br /> DEMOLITION NECESSARY FOR NEW CONSTRUCTION AND ARE MEANT TO AID THE CONTRACTOR <br /> IN EVALUATION OF THE EXTENT OF DEMOLITION.THE CONTRACTOR(S)ARE RESPONSIBLE FOR <br /> 6 8 VERIFYING ALL EXISTING CONDITIONS,COORDINATING ALL NECESSARY REQUIREMENTS AND <br /> A34 A34 PERFORMING ALL DEMOLITION REQUIRED FOR NEW CONSTRUCTION WHETHER SHOWN OR <br /> NOT. <br /> B. FIELD INSPECT DEMOLITION SCOPE PRIOR TO REMOVAL.INSURE REMOVAL DOES NOT IMPAIR <br /> STRUCTURAL INTEGRITY OF EXISTING STRUCTURE TO REMAIN.IF FIELD INSPECTION INDICATES <br /> STRUCTURAL INTEGRITY MAY BE IMPAIRED,CONTRACTOR(S)SHALL NOTIFY ARCHITECT/ <br /> STRUCTURAL ENGINEER AND OWNER IMMEDIATELY AND TAKE IMMEDIATE ACTION TO ENSURE <br /> SAFETY OF STRUCTURE WHILE PERMANENT SOLUTION IS DEVELOPED. <br /> C. DO NOT SCALE ANY DRAWINGS.FIELD VERIFY ALL EXISTING CONDITIONS.REPORTANY <br /> DISCREPANCIES TO THE ARCHITECT FOR RESOLUTION. <br /> D. GENERAL CONTRACTOR TO COORDINATE ALL DEMOLITION WORK AMONG ALL TRADES. <br /> E. VERIFY ALL EXISTING WALL,FLOOR,CEILING,AND ROOF CONSTRUCTION TO DETERMINE <br /> _ EXTENT AND METHODS OF DEMOLITION REQUIRED FOR NEW CONSTRUCTION. <br /> b� • WH <br /> F. VERIFY LOCATION OF EXISTING UTILITIES AND UNDERGROUND CONDUITS,CHASES,AND SOIL <br /> i I L_ <br /> CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION <br /> 41 _ • G. MAINTAIN ALL EXISTING EXITS AND EGRESS FOR THE DURATION OF THE CONSTRUCTION. uj <br /> — 14 <br /> —— I EXISTING UNIT HEATER TO REMAIN H. ALL EXISTING SPACES IN OPERATION SHALL BE MAINTAINED WATER TIGHT THROUGOUT <br /> / 14 CONSTRUCTION.EXISTING SPACES REMAINING IN OPERATION SHALL BE MAINTAINED DUST <br /> 2 FREE THROUGHOUT CONSTRUCTION.PHASED AREAS OF WORK ACHIEVING TEMPORARY <br /> —— CERTIFICATE OF OCCUPANCY SHALL THEREAFTER BE MAINTAINED DUST FREE FOR THE <br /> A34 BALANCE OF CONSTRUCTION. \ Q <br /> o / N w <br /> j — I. IF HAZARDOUS MATERIALS ARE UNCOVERED DURING DEMOLITION OR CONSTRUCTION NOTIFY 00 (f) <br /> • • THE ARCHITECT AND OWNER IMMEDIATELY. 0) <br /> J. OWNER WILL REMOVE FURNISHINGS AND LOOSE EQUIPMENT PRIOR TO DEMOLITION. W a a <br /> 5 9 ` K. REMOVE AND/OR DEMOLISH ITEMS INDICATED.THE OWNER HAS THE RIGHT OF FIRST REFUSAL <br /> STORAGE ON EXISTING MATERIALS AND EQUIPMENT REMOVED FROM THE SITE.VERIFY WITH OWNER ALL <br /> 15 \\ g EXISTING MATERIAL,CASEWORK,EQUIPMENT,LIGHT FIXTURES,SYSTEM FURNISHINGS,DOORS, <br /> �\ \ OR FRAMES WHICH SHALL BE SALVAGED PRIOR TO REMOVAL.TURN OVER SALVAGE �/ W Q <br /> Unconditioned EXISTING ROOMS LL <br /> \ \ — MATERIALS TO OWNER ANDIOR STORE ON SITE AS INDICATED BY THE OWNER.CONTRACTOR Ii TO REMAIN- SHALL PROPERLY DISPOSE OF REMAINING ITEMS AND REMOVE FROM THE SITE IMMEDIATELY. a <br /> UNCONDITIONED W <br /> 10 \ / SPACES L. O <br /> \ // 2 Lu O <br /> M. REFER TO MECHANICAL,ELECTRICAL,PLUMBING,AND STRUCTURAL DRAWINGS FOR LL.I O <br /> \ / / ADDITIONAL INFORMATION,DEMOLITION WORK,AND COORDINATION REQUIREMENTS. J <br /> \ \ / N. FOR INFILLING ALL PLUMBING TRENCHES IN CONCRETE,TIE NEW AND EXISTING CONCRETE J <br /> LL <br /> TOGETHER USING#4 REBAR @ 16"D.C.TYP. uj Z <br /> 0. REMOVE ALL EXISTING WINDOW TREATMENTS(MINI-BLINDS,ETC)AND PATCH WINDOW JAMBS <br /> 4 OR HEADS AS REQUIRED. Ir— <br /> EXISTING COLUMNS CD <br /> J <br /> \ ` STORAGE TO REMAIN P. ALL EXISTING LIGHTING,EXIT LIGHTING,EMERGENCY LIGHTING TO REMAIN UNLESS OTHERWISE W CD O <br /> NOTED ON REFLECTED CEILING PLAN OR ELECTRICAL LIGHTING PLAN. <br /> Unconditioned (' � w <br /> p % \ Q. ALL CASEWORK TO BE REMOVED THROUGHOUT. <br /> 14 �,,° / / y STORAGE Q o <br /> R. <br /> PR THE <br /> EXISTING <br /> TO DETERMINE THE EXACT LOCATION OF THE EXISTING � <br /> Unconditioned SANITARY LINE.(GP <br /> S. IT IS THE GENERAL CONTRACTOR'S CHOICE TO REPLACE THE EXISTING GYPSUM BOARD ALONG <br /> 7 \ / \ THE EXTERIOR KNEE WALL IN ITS ENTIRETY WITH NEW GYP.BOARD IF DEEMED MORE O <br /> \ ECONOMICAL AT NO ADDITIONAL COST TO THE OWNER.INDICATE CHOICE WITH BID <br /> \ SUBMISSION. <br /> \ T. ADDITIONAL DEMO WORK MAY BE REQUIRED FOR NEW RECESSED EQUIPMENT,REFER TO <br /> \ B EQUIPMENT PLANS FOR MORE INFORMATION. <br /> \\\ DEMOLITION KEYNOTES <br /> \ II <br /> REMOVE ALL EXISTING SUSPENDED CEILING TILE,DIFFUSERS,AND LIGHTING THROUGHOUT. <br /> \ EXISTING CEILING GRID TO REMAIN. <br /> \\ 2 <br /> O EXISTING SUSPENDED CEILING GRID,TILE TO REMAIN.EXISTING LIGHTING TO BE REMOVED AND <br /> REPLACED. <br /> GARAGE \\\ O PAN OR GYPSUM <br /> NEW CEILIOARD NG WORKING AND LIGHTING TO BE REMOVED.REFER TO REFLECTED CEILING <br /> IMF EXISTING Unconditioned \\\ qO EXISTING GYPSUM BOARD CEILING TO REMAIN.ANY EXISTING LIGHTING TO BE REMOVED AND <br /> REPLACED.PATCH CEILING TO MATCH EXISTING FINISH.REFER TO REFLECTED CEILING PLAN FOR <br /> NEW WORK. <br /> THE 5 REMOVE EXISTING PLUMBING FIXTURE IN ITS ENTIRETY. —I <br /> q (S)ANDI GARAGE SPACES(S--STING SPACES W USED BYDE LTO E BOY SCOUTS OF AMWER LEVEL)WERE IERICA.ALLGINALLY TTOHEESEE O REFER TO PLUMBING PLANS FOR REMOVAL OF EXISTING FLOOR DRAINS AND DRAIN LINES. 8 B AR G ITEC <br /> SPACES WERE UNCONDITIONED EXCEPT FOR THE STAIR(S102)FROM ABOVE.THE <br /> STREET(UPPER)LEVEL FLOOR CONTAINS THE BUSINESS(B)OFFICES OF THE BOY �7 REMOVE CONCRETE SLAB IN THIS CROSS HATCHED AREA.COORDINATE EXACT LOCATIONS OF <br /> SCOUTS OF AMERICA AND ARE CONDITIONED. DEMOLITION WORK WITH ARCHITECTURAL FLOOR PLAN'S NEW CONSTRUCTION. aue ws <br /> OF WASH ON <br /> Og REMOVE PORTION OF WALL FOR NEW DOOR/OPENING.REFER TO ARCHITECTURAL PLAN&DOOR _ `bti — <br /> EXISTING COLUMN SCHEDULE FOR INFORMATION. _ <br /> TO REMAIN O REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK..REFER TO ARCHITECTURAL PLAN& <br /> DOOR SCHEDULE FOR INFORMATION. <br /> 10 REMOVE EXISTING DOOR AND FRAME AS REQUIRED FOR NEW WORK.PATCH AND REPAIR WALL <br /> AS REQUIRED BY NEW WORK.STORE DOOR FOR POSSIBLE REUSE. <br /> oa� <br /> 11 REMOVE EXISTING SECTIONAL DOOR AND FRAME AS REQUIRED FOR NEW WORK.COORDINATE <br /> WITH OWNER WHETHER OR NOT TO BE SALVAGED.NEW WALL INFILL TO BE INSTALLED AT <br /> EXISTING OPENING MATCH EXISTING MATERIALS AND FINISHES. <br /> AREA IS CONDITIONED SPACE FROM LEVEL ABOVE- EXISTING WINDOW TO REMAIN.REMOVE THE EXISTING SECTIONAL DOOR IN ITS ENTIRETY.PATCH <br /> 109 SQUARE FEET-APPROX. 12 AND REPAIR WALLS AND CEILING AS REQUIRED BY NEW WORK. 00 <br /> 13 REMOVE ALL CASEWORK/SHELVING IN ITS ENTIRETY. <br /> AREA IS SEMI-CONDITIONED SPACE WITH UNIT <br /> HEATERS ONLY-4,561 SQUARE FEET-APPROX. 14 REMOVE WOOD STAIRS,LANDING AND RAILINGS IN THEIR ENTIRETY. <br /> 15 GC TO VERIFY CONDITION OF WOOD PLATFORM FLOOR UNDER EXISTING TOILET.REFRAME AND <br /> PROVIDE 1 1/2"CONCRETE TOPPING TO BE FLUSH WITH ADJACENT SLAB AS NECESSARY. <br /> Q <br /> PLOT DATE JAN 10 <br /> 11 <br /> 025 <br /> PROJECT NUMBER: 2 O-S <br /> SHEET: DEMOLITION FLOOR <br /> PLAN_ <br /> PHASE 1 <br /> A07 <br /> N <br /> n FIRST FLOOR EXISTING PLAN WI DEMO "�F�,pOFS.NTT.GIVEN IN <br /> A07 114"=1'-0" oNLYPuaBTFCT WITH <br /> City of Everett Permit Services Mo<RE`w NT S pj <br /> EVERETT Reviewed for Permit 05/20/2025 NO BEMADEWITHOUr THEPRIORAY <br /> "•••,•••'• WRITTEN CONSENT OF <br /> COMMON'W RIGHTS TARE HEREBY <br />