Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer - Exhibit A Scope of Work <br />28 <br />•RFI responses. <br />Task 1052.5 Bluebeam Session Management <br />BC will maintain a set of conformed Contract Documents in a Bluebeam Studio Session reflecting <br />design and field changes that are accessible to the Design Team, City and City’s CM for the duration <br />of the project. The Bid Documents are the official documents; the Conformed Documents are for the <br />convenience of the contractor. <br />The conformed documents shall be updated by BC on a monthly basis to reflect recent approved <br />submittals, Change Orders (COs), and RFIs as well as other field changes not captured in an RFI or <br />CO. <br />The marked up conformed documents will be the basis for subsequent CO and RFI responses. <br />The City and the City’s CM are responsible for updating the redline as-built documents that reflect <br />changes made in the field and providing updates monthly, prior to the Bluebeam updates. Bluebeam <br />updates will be based on final and official documents provided to the BC team by the City. <br />Drawings: <br />In general, markups in Conformed Drawings shall be done in the following manner and include the <br />following information: <br />•Add notes on drawings with appropriate reference numbers to RFIs, Change Orders, Field <br />Directives, or other approved changes. <br />•Maintain/Update Drawing Revision Blocks <br />•Markups should indicate general area affected and give brief description of the issue. <br />•Use revision clouds and create linework where needed to help identify area and change. <br />Specifications: <br />In general, markups in conformed specifications shall be done in the following manner and include <br />the following information: <br />•Add notes on specifications with appropriate reference numbers to Submittals, RFIs, Change <br />Orders, or Field Directives. <br />•Markups should indicate equipment and/or spec requirements affected. <br />o Indicate submitted manufacturer/model under “Acceptable Manufacturers” by yellow <br />highlight in spec or add notes summarizing where a substitution was accepted <br />•Use revision clouds where needed to help identify items and specific change/revision in <br />Bluebeam. <br />Activities/Approach: <br />•Coordinate with the City and the City’s CM regarding City staff and City’s CM staff <br />permissions for Bluebeam access. <br />•Conformed Documents will be reviewed monthly during meeting between Design Team and <br />City Staff. It is estimated that updates will be made weekly for 18 months at four hours per <br />week (312 total hours). The final documents will be transferred to the City at the end of the <br />project. <br />•Two training sessions on how to review documents in the Bluebeam Session (Bluebeam <br />2020 or newer) will be provided to City and City’s CM staff. BC will establish a common user